Presentation is loading. Please wait.

Presentation is loading. Please wait.

TCTF General Assembly Meeting Chair’s Report

Similar presentations


Presentation on theme: "TCTF General Assembly Meeting Chair’s Report"— Presentation transcript:

1 TCTF General Assembly Meeting Chair’s Report
November 2010, Pattaya, Thailand Mizuhiko HOSOKAWA, TCTF Chair

2 1. Structure of TCTF (since Nov. 2008)
· Chair: M. HOSOKAWA Technical secretary: Y. KOYAMA (NICT) · WG on MRA (Mutual Recognition Arrangement) Coordinator: H. ITO (NICT) · WG on GNSS (Global Navigation Satellite System) Coordinator: B. WARRINGTON (NMIA) Sub-coordinator: Y. FUJII (NMIJ) Remote calibration: M. Imae · WG on TWSTFT (Two-Way Satellite Time and Frequency Transfer) Coordinator: H. MAENO (NICT) · WG on OFM (Optical Frequency Metrology) Coordinator: F. L. HONG (NMIJ)

3 Review of CMCs from APMP member NMIs
· APMP.TF November 4, 2009 for the CMC from VMI Intra-regional review completed on Jan. 15, 2010 Reviewed comments were received from SIM, AFRIMETS and EURAMET in April Posted revised CMCs on June 9, 2010. Published the BIPM KCDB on July · APMP.TF April 15, 2010 for the CMC from NPLI Intra-regional review is completed on Oct. 18, 2010. · APMP.TF April 15, 2010 for the CMC from A-Star Intra-regional review is going on

4

5 2.2 WG on TWSTFT  2.3 WG on OFM 3. Conferences in the T&F research field 1) CPEM 2010 held in Korea. 2) AP-RASC’10 held for 5 days from September 22, 2010 at Toyama International Conference Center, Toyama, Japan Five sessions as the joint sessions of ATF2010 (Asia Pacific Time and Frequency Workshop). About 580 researchers participated from 29 economies in total. Within the 519 total number of submitted papers, 46 papers related with the time and frequency metrology were presented.

6 TCC meeting, July 2010, Manila
Implementation of CIPM MRA Peer reviewers to be instructed by the APMP guidelines to include existing CMCs in the reviews. In the case that an NMI des not submit any CMCs for 5 year, the issue is handled through the QS review mechanism. Strategic Directions for APMP The main focus of APMP should gradually shift towards supporting research, developing of new technologies and new services for industry. Support of DEC activities TC chairs recognise the differences in the development status of APMP's developing economy NMIs (DENs) and try to account for it when developing its activities. Effectiveness of APMP Meetings Mid-year meetings :worth while to have mid-year TCCs meeting.

7 On-site peer review / assessment JCRB MRA Appendix C – BIPM Database
NMI: TC / TCQS delegate if necessary 4 Additional information/questions 5 Reply QS-1 with Evidence CMCs with Evidence 4,11 Review results 5,12 Revision 1 CMC Submission 2 Review Request TCQS Chair QS Reviewers 3 Review Results 2 Review Request QS-3 QS-7 CMC Reviewers TC Chair 6 QS Approval Notice 3 Review Results APMP Secretary CMC Submission NMI action TC Chair action JCRB action TCQS Chair action Reviewer action RMOs to/from NMI or TC Chair APMP Secretary action 7,13 Posting CMCs 10 Review Results 16 CMC Approval Notice Completed CMCs 7 QS-7 8,14 Review Request JCRB CMC website RMOs JCRB 9,15 Review Results 17 Recommended period for efficient publication 1 ~ 4 : Two months after CMC submission 5, 6 : Dependent on NMI reaction 7 ~ 10 : Two months after NMI revision 11, 12 : Dependent on NMI reaction 13 ~ 17 : One month after NMI revision JCRB MRA Appendix C – BIPM Database

8 JCRB MRA Appendix C – BIPM Database Peer Review / Assessment Team
APMP Secretary TCQS Chair TC JCRB MRA Appendix C – BIPM Database QS-3, QS-7 Completed CMCs RMOs QS-1 with Evidence CMCs with Evidence CMC Reviewers 5 Review Request 6 Review Results QS QS-3 QS-7 7 Additional information/questions 8 Reply 7,14 Review results 8,15 Revision 4 CMC Submission 11,17 Review 12,18 Review JCRB CMC website NMI: TC / TCQS delegate Peer Review / Assessment Team 13 Review 19 CMC Approval Notice NMI action TC Chair action JCRB action TCQS Chair action Reviewer action RMOs to/from NMI or TC Chair (if necessary) APMP Secretary action 10,16 Posting CMCs 9 QS Approval 10 20 3 On-site peer review / assessment 2 Approval of technical reviewers 1 Request for approval of technical reviewers 21 Confirmation of CMC publication

9 Matters to be discussed
* CMC template for the correct and easy estimation of uncertainties * Peer Reviewer Selection and Training Supporting research, developing of new technlogy Workshop, communications, researcher exchange DEC support What can we do?

10 Supporting research, developing of new technology
Workshop, communications, researcher exchange URSI meeting (Aug.2011), FCS/EFTF (May 2011) DEC support What can we do? training, researcher exchange, Next TCTF chair? 2+2 -> 3+1?

11 Peer Reviewer Selection and Training
Concentration on a few person Register potential reviewer(s) from each NMI CMC review, contribution to CMC templates by the person. -> proof of the review ability Occasions for training or discussion Request, Institute basis, not person basis Exhibit the name of the reviewer officially ?


Download ppt "TCTF General Assembly Meeting Chair’s Report"

Similar presentations


Ads by Google