Presentation is loading. Please wait.

Presentation is loading. Please wait.

Hammer Project KV020 S-KPI CBO

Similar presentations


Presentation on theme: "Hammer Project KV020 S-KPI CBO"— Presentation transcript:

1 Hammer Project KV020 S-KPI CBO
Project CA project S00674 oss KPI justification - Appendix © Ericsson AB 2016

2 Multitech 2G kpi Justification
PROJECT BAU MODERNIZATION Multitech 2G kpi Justification

3 Refer to OSS Justification
S G oss kpi justification # Description Target Value Technology Baseline KPI Result PASS/FAIL comments 2G (12/23/ /29/16) (4/6/2017-4/12/2017) A Cell Availability Maintain/Improved 99.62 99.45 Fail Refer to OSS Justification A CSSR_Voice 99.63 99.57 A DCR_Voice 0.33 0.32 PASS A PS_Drop 0.93 A Timing Advance A CS Traffic (Erl) A TCH attempt 161946 170150 A PS traffic (GB) 109.77 133.18

4 S00674 2G oss kpi justification
Analysis: TCH Availability degradation due to above cells having fluctuation during result calculation period and back to normal afterwards.

5 S00674 2G oss kpi justification
Analysis: CSSR degradation due to above cells having sudden SD Blocking during result calculation period and back to normal afterwards.

6 Hammer Project KV020 S-KPI CBO
© Ericsson AB 2016


Download ppt "Hammer Project KV020 S-KPI CBO"

Similar presentations


Ads by Google