Presentation is loading. Please wait.

Presentation is loading. Please wait.

Technical meeting Dury, France 13-Sep-2017 Robert Reinhardt

Similar presentations


Presentation on theme: "Technical meeting Dury, France 13-Sep-2017 Robert Reinhardt"— Presentation transcript:

1 Technical meeting Dury, France 13-Sep-2017 Robert Reinhardt
Status Technical meeting Dury, France 13-Sep-2017 Robert Reinhardt

2 Plan

3 Deliverables (due by Jan-2018)
# Deliverable Title Lead Beneficiary Due Month Due month Submitted Delay D11.2 POPD - Requirement No. 1 INSPIRALIA 2 Jul-2016 115 D11.3 POPD - Requirement No. 4 D11.4 A - Requirement No. 3 D11.1 EPQ - Requirement No. 5 134 D1.1 Growth protocol of algae strain in saline wastewaters FPTP 5 Oct-2016 154 D7.1 System settings and model SP 10 Mar-2017 3 D10.1 Project Management Plan 6 Nov-2016 159 D2.1 Characterization of industrial wastewater and design of primary and pre-treatment processes BIBOAQUA 38 D1.2 Identification of best performing Algae/ bacteria consortia and definition of monitoring protocols 9 Feb-2017 102 D3.1 Design specifications and manufacture / configuration development report DCU 12 May-2017 11 D9.1 First Plan of exploitation and disemination of results ENCO 57 D5.1 HRAP design and operation assessment and development of new sensors ARAVA 68 D4.1 Systems design for harvesting and refinement, algae characterisation IBET 14 Jul-2017 D2.2 Optimisation of anaerobic processes and CO2 recovery solution NOVA 18 Nov-2017 D3.2 Optimisation of final systems ready for demonstration trials D4.2 Biomass valorisation CVG/EXTRACTIS 20 Jan-2018

4 Issues reported Shipment and installation of equipment for demos - ARAVA, KOTO, ARCH (BBA, NOVA) KOTO needs detailed list of equipment and chosen contractor (for permits) from NOVA for AD and for pre-treatment from BBA Shipment and installation of sensors for demos (OXI) Will there be desalination unit in KOTO and when (DCU, BBA) KOTO - details for DAF system (AlgEn) EXTRACTIS need new algal samples from KOTO and ARAVA for refinement D4.1 (EXT) not submitted ENCO would like results collected up until now (dissemination - what goes on web and what is confidential)

5 7M€ / 30 deliverables = 230 k€ / deliverable
Number Title WP Lead beneficiary (editor) WP leader Due date 7M€ / 30 deliverables = 230 k€ / deliverable

6 Deliverable process Preparation Writing Approval & Submission
Who does what How long does it take

7 Deliverable process Preparation Writing Approval & Submission TOC:
what who when DoW coverage: tasks & activities <-> TOC Common issues: terminology main references scope Contents by Chapters: contributions Editorial work: homogenity terminology style references overlap (int and ext) story (narrative) Check: tasks & activities <-> TOC TOC <-> actual text gaps Reading by partners consistency readability language quality disclosure Editorial work: merge style push Approval as above

8 Deliverable process Preparation Writing Approval & Submission TOC:
what who when DoW coverage: tasks & activities <-> TOC Common issues: terminology main references scope Contents by Chapters: contributions Editorial work: homogenity terminology style references overlap (int and ext) story (narrative) Check: tasks & activities <-> TOC TOC <-> actual text gaps contributors editor Reading by partners consistency readability language quality disclosure Editorial work: merge style push Approval as above partners WP leader editor editor WP leader editor TechMgr ProjMgr

9 Deliverable process Preparation Writing Approval & Submission TOC:
what who when DoW coverage: tasks & activities <-> TOC Common issues: terminology main references scope editor Contents by Chapters: contributions Editorial work: homogenity terminology style references overlap (int and ext) story (narrative) Check: tasks & activities <-> TOC TOC <-> actual text gaps contributors Reading by partners consistency readability language quality disclosure Editorial work: merge style push Approval as above partners WP leader editor editor WP leader editor TechMgr ProjMgr 2 weeks 6-8 weeks 2 weeks 3 months

10 Deliverables past & future
Our weakpoints Actions Timing Structure DoW compliance Level – state of the art Language Style References 3-4 months TOC Outlines of chapters Language review (who, when) Template & style editor (RR) Library & reference system (Word XREF) ENCO File server!!

11 Discussion Questions Suggestions Check upcoming deliverables

12 Upcoming deliverables
Systems design for harvesting and refinement, algae characterisation IBET 14 Jul-2017 D2.2 Optimisation of anaerobic processes and CO2 recovery solution NOVA 18 Nov-2017 D3.2 Optimisation of final systems ready for demonstration trials D4.2 Biomass valorisation CVG/EXTRACTIS 20 Jan-2018 D5.2 Report on HRAP Operation and Technology integration ALGEN 24 May-2018 D6.1 System setup, testing and commissioning report BIBOAQUA D6.2 Report on operation in first 6 months ARCHIMEDE D7.2 Progress report on Techno- Economic evaluation, environmental, social and integrated sustainability assessments SP D8.1 Technology Innovation System Analysis EUBIA D9.2 Second Plan of exploitation and dissemination of results ENCO D4.3 Biomass valorisation progress report – first generation products INSPIRALIA 28 Sep-2018

13


Download ppt "Technical meeting Dury, France 13-Sep-2017 Robert Reinhardt"

Similar presentations


Ads by Google