Download presentation
Presentation is loading. Please wait.
1
Bridge Contest Sample Presentation
Essential Presentation Elements Group Name, Member Names Group’s Division of Labor Numbers Needed to Calculate Cost Type of Truss Truss Figure Estimated Mass, Cost, Strength Any special features of bridge design Presentation Time: minutes (5 - 8 slides) An example presentation follows this slide
2
Balsa Wood Bridge Design
Group AAA Jim Bowen
3
Group AAA Division of Labor
Jim Bowen did all the work Bridge design, construction, testing Matlab program development Oral presentation
4
Group AAA - Bridge Information
Bridge dimensions 24.5” long, 8.5” high, 4.0” wide Bridge “numbers” 10 nodes in bridge (5 per truss) 1 member type (.25” x .50”) 0” of 1/8”x1/8” wood 245” of 1/4”x1/4” wood Truss configuration Warren through truss (see figure)
5
Truss Design - Group AAA
6
More Bridge Information
Estimates from Matlab program Mass = 69 grams Strength = 111 lb Cost = 26.5 million $ Benefit = 29.0 million $ Profit = 2.5 million $ Special features of group’s work used Matlab program to test many different candidate designs Questions?
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.