Presentation is loading. Please wait.

Presentation is loading. Please wait.

Preparatory Measurement

Similar presentations


Presentation on theme: "Preparatory Measurement"— Presentation transcript:

1

2 Preparatory Measurement
WRS broadcast and WRS L1 synchronisation PPS alignment (Scope) WRS fabric time delay in different L1 ports (6,7,9)

3 Measured in advance = 24540 ps (consistent with length 500±1 cm)
SC (patch A) WRS Broadcast Port 18 WR Calibrator Optical Box DC (patch D) WRS L1 Port 6 Port 7 Port 9 DC (patch C) SC (patch B) SFP KM3NeT WR reference calibrator All fiber patches (A,B,C,D) have equal length and, thus equal time delay Measured in advance = ps (consistent with length 500±1 cm) The WR Calibrator Optical box has measured time delays SC line = ps DC line =11251 ps Bidirectional line =

4 Results of the preparatory Measurement
WRL1 PORT 6 and SFP ch21H on Calibrator CLB

5 Results of the preparatory Measurement
WRL1 PORT 7 and SFP ch21H on Calibrator CLB

6 Results of the preparatory Measurement
WRL1 PORT 9 and SFP ch21H on Calibrator CLB Average refers to SFP ch21H only

7 ARCA Shore Station Optical asymmetry measurement
Compliant to requests of TDR v2 till May 2016

8 Measurement of Shore Station DC Path
SC (shore station fiber) Optical Rack WRS Broadcast Port 18 MEOC FC/APC connector SC (patch B + FC/APC to LC fiber 1m) WR Calibrator Optical Box 5 dB DC (patch D) SC (patch A) 5 dB WRS L1 SFP Port 6 Port 7 Port 9 KM3NeT WR reference calibrator Measurement of Shore Station DC Path

9 Results of the asymmetry (SC path) Measurement
WRL1 PORT 7 and SFP ch52C on Calibrator CLB (ARCA-DU001)

10 Results of the asymmetry (SC path) Measurement
WRL1 PORT 6 and SFP ch51C on Calibrator CLB(ARCA-DU002) (Average) difference of only 270 ps among the two ports

11 Measurement of Shore Station DC Path
SC (patch A) Optical Rack WRS Broadcast Port 18 MEOC FC/APC connector SC (shore station) DC (patch B + FC/APC to LC fiber 1m) WR Calibrator Optical Box DC (patch D) 20 dB 5 dB WRS L1 SFP Port 6 Port 7 Port 9 KM3NeT WR reference calibrator Measurement of Shore Station DC Path

12 Results of the asymmetry (DC path) Measurement
WRL1 PORT 7 and SFP ch52C on Calibrator CLB (ARCA-DU001)

13 Results of the asymmetry (DC path) Measurement
WRL1 PORT 6 and SFP ch51C on Calibrator CLB(ARCA-DU002) (Average) difference of ps among the two ports (ARCA DU001 delay is larger)

14 ARCA Shore Station RTT Cable measurement
New request on May 2015 (TDR v3) Measure RTT_cable of DU Test Station and ARCA Shore Station indirect way to recover RTT_Cable

15

16 SFP SC (shore station fiber) Optical Rack WRS Broadcast
Port 18 MEOC FC/APC connector SC (shore station fiber) patch B + FC/APC to LC fiber 1m (SC and DC) WR Calibrator Optical Box patch D(DC) patch A (SC) WRS L1 SFP Port 6 Port 7 Port 9 KM3NeT WR reference calibrator

17 Results of the Shore Station RTT Cable Measurement
WRL1 PORT 7 and SFP ch52C on Calibrator CLB(ARCA-DU002)


Download ppt "Preparatory Measurement"

Similar presentations


Ads by Google