Development of the Passenger terminal in Port of Bar
CAPTAIN Project MIDTERM EVENT Rijeka 15th September
2
CONTENT General overview
Passenger terminal in Port of Bar – general data Development activities (ADRIMOB) Development activities (EA SEA-WAY) Development activities (CAPTAIN)
3
GENERAL OVERVIEW Port of Bar is the central port of the Montenegrin port system and has capacities and development potentials to reach regional importance Port of Bar is a share hold company; 54% of share hold are owned by state of Montenegro; The Passenger terminal (Lattitude , Longtitude ) in the Port of Bar is located in the most northern part of the port;
4
PASSENGER TERMINAL
5
PASSENGER TERMINAL DATA
BERTH (N0) 51 52 53 54 LENGHT(m) 97.5 20 107.5 DEPTH(m) 4 5.8 5.5 5.9 Berths at Passenger terminal
6
PASSENGER TERMINAL DATA
Distances: Promenade 200m Center of the city 400m Bus station 1,7km Railway station 1,9km
7
PASSENGER TERMINAL DATA
Bar is conected with Bari (all year); Ferry operator: Barska plovidba (Montenegro lines); Ship: Sveti Stefan II; Ship capacity: Sveti Stefan II (720 pass., 225 cars or 36 trailers);
8
DEVELOPMENT (ADRIMOB)
Upgrading services Improving performances of Passenger Terminal (purchasing of equipments), these purchasing improved efficiency of handling operations during the ship loading/unloading process and it can be used for serving different other needs at the Passenger terminal (removal of ramps, etc.). Preparation of the Study referred to the future directions of development functions on Passenger terminal in the Port of Bar (prepared by University of Rijeka - Faculty of Maritime Studies in Rijeka)
9
DEVELOPMENT (EA SEA-WAY)
Extension of the quay at the Passenger Terminal will improve accessibility of the port with focus on medium/large Ro-Pax ships (with deeper draft) and cruise ships in the Port of Bar. According to the national plan, building of the new part of the quay can be followed with the building of supporting facilities (new facilities, roads, etc.);
10
DEVELOPMENT (EA SEA-WAY)
Technical documentation for development of the Passenger terminal (Final design of the new 400m of the quay at the Passenger terminal in Port of Bar) is in the final phase; Development of the Passenger terminal will enable the development of new passenger /cruise and Ro-Pax lines in the Port of Bar;
11
DEVELOPMENT (EA SEA-WAY)
Civil Institute Macedonia from Skopje was selected for the preparation of the Final design; Option with concrete blocks was selected mainly due to the nivelation problem (old berths are also made by concrete blocks);
12
DEVELOPMENT (EA SEA-WAY)
The correct dimensions of the new part of the quay are: Lenght – 432,85m; Width – 30,00m;
13
DEVELOPMENT (EA SEA-WAY)
14
CAPTAIN ACTIVITIES Capitalization of ADRIMOB Joint action plan
“...Finally, capitalization of the ADRIMOB project and the results achieved, can be supported through further partners cooperation directed to achievement of already defined strategic goals and with the realization of the proposed actions of the Joint Action plan.... „ Feasibility studies on infrastructural interventions in Bar (CAPTAIN Application form)