Download presentation
Presentation is loading. Please wait.
Published byMartin Terry Modified over 6 years ago
1
Fotis Karayannis HellasGrid Scientific Coordinator GRNET
The National Grid Initiative in Greece Fotis Karayannis HellasGrid Scientific Coordinator GRNET
2
Outline GRNET dual mission: The HellasGrid National Grid initiative
Research Networking and Grid infrastructure The HellasGrid National Grid initiative Infrastructure Organisation Applications communities HellasGrid as part of the European efforts Networking and Grid projects Challenges/Experiences EGI SEE Workshop Athens, 19 April 2006
3
GRNET Dual Mission The EU e-Infrastructure vision: Integrated Networking + Grid infrastructures GRNET was one of the first NRENs* in Europe adopting the EU e-Infrastructure initiative: Providing both networking and grid infrastructures * NREN: National Research and Education Network Being infrastructure-oriented and application-neutral serving all user eScience communities Expanding its scope to e-Business and e-Government Source: European Commission Unit F3: Research Infrastructures EGI SEE Workshop Athens, 19 April 2006
4
GRNET strategic projects and funding
Research Network projects GRNET2 project, , 20 MEuro 2,5 Gbps leased lambda backbone network Pilot dark fiber acquisition projects (15 years lease) + optical equipment Pilot Grid Demokritos (Isabella) Access project (called “105”), , 10 MEuro 1 Gigabit Access for ~50 institutes GRNET3 project, , 30 MEuro (recently approved!) Dark fiber research back-bone network in Greece Optical MANs for Athens, Thessaloniki (the rest to be covered by regional MANs (called “93”) Optical equipment RFI already published PanEuropean connectivity & integration project: GEANT2, Regional Support Projects: SEEREN-SEEREN2, Eumedconnect Grid projects Hellasgrid Task Force, , (support money) Hellasgrid Strategy Document Pilot Grid Demokritos (0,5M by GRNET2) Hellasgrid Project, , ~2 MEuro ~800 CPUs, ~ 90TB storage (30TB disks + 60 TB tape libraries), 4 advanced video-conferencing Access Grid nodes Grid Applications Call, ,~0,5M PanEuropean integration projects: EGEE Project, , 1,3MEuros EGEE-II, , 1,8M Euros Supported operations, training, policies Regional Support projects: SEEGRID, SEEGRID2, Eumedgrid, EuChinaGrid Other projects: GridCC, e-IRGSP EGI SEE Workshop Athens, 19 April 2006
5
The GRNET Network Backbone is currently based on 2,5 Gbps leased lambdas Dark fiber has been acquired for 3 network spans (pilot phase) Dark fiber tender for the whole backbone on-going (one offer received) International connectivity 2 * 10 Gbps any day (currently 2* 2,5 Gbps) EGI SEE Workshop Athens, 19 April 2006
6
The HellasGrid National Grid Initiative
HellasGrid Task Force appointed by the Ministry of Economy and Finance at the end of 2002 (MNEC is running the national InfoSoc programme) A strategy group supported by a scientific committee Produced a strategy document The Task Force prepared the National Integration Proposal The HellasGrid MoU was signed at the end of 2003 Pilot Phase (Phase I): GRNET Pilot Infrastructure installation Isabella site: 64 CPUs, 10 TB SAN, 12 TB Tape Library Participation in EGEE proposal, Coordination of SEE-GRID Consolidation Phase (Phase II): HellasGrid project implementation Extension of Grid infrastructure (~800 CPUs, 30TB disks, 60TB tape libraries) – (~2 MEuros) Integration in EGEE The HellasGrid MoU was used to form a Joint Research Unit (JRU) GRNET provided a recognition letter by the Ministry after EC request Further application support (~0,5M – 1M Euros) Investigation for further infrastructure support (~1 MEuros) EGI SEE Workshop Athens, 19 April 2006
7
The HellasGrid members
Coordinator National Research and Education Network, GRNET – Universities (10) Aristotle University of Thessaloniki, AUTH Athens University of Business, AUEB National Technical University of Athens, NTUA University of the Aegean University of Athens, UoA University of Crete, UoC University of Ioannina, UoI University of Macedonia, UoM University of Patras UPATRAS University of Pireus UNIPI Research Centres (8) Research and Academic Computer Technology Institute, CTI Centre for Research and Technology Hellas, CERTH Institute of Computer Science – FORTH, Institute of Accelerator Systems and Applications, IASA Institute of Communication and Computer Systems, ICCS National Meteorology Service, EMYwww.emy.gr National Observatory of Athens, NOA Research Centre Demokritos, DEMOKRITOS EGI SEE Workshop Athens, 19 April 2006
8
HELLASGRID infrastructure
HG-01 Demokritos: 64 CPU, 10TB FC SAN, 12TB Tape Library, EGEE LCG2 middleware HG02-HG06 clusters located in: Athens (NDC/EKT, IASA) Thessaloniki (AUTH) Crete (ICS-FORTH) Patras (CTI) ~800 CPUs (x86_64, 2 GB RAM, 80GB HDD, 2x Gbit) ~30 TBytes total raw SAN storage capacity ~80TBytes Tape Library 4 Access Grid nodes EGI SEE Workshop Athens, 19 April 2006
9
HG organisation: Teamwork!
Overall coordination: GRNET headquarters Cooperation with HellaGrid partners: Main site + ROC operator : HG-01-GRNET (Isabella, HG-02…HG-06 sites + operation centers (NDC, IASA, AUTH, FORTH, CTI) 5 smaller private sites (AUTH, UoM, FORTH, Demokritos, HEP-NTUA) HG CA and VOMS (GridAUTH, Dept. of Physics, AUTH) HG helpdesk (CTI) Regional monitoring tools (ICS-FORTH) HG user support/apps (Demokritos + all site teams) 4 AccessGRID sites HG membership: ~18 members (10 Universities + 8 Research Institutes) 6 HellasGrid+5 private sites > 900 CPUs in total EGI SEE Workshop Athens, 19 April 2006
10
HG-01-GRNET Isabella EGI SEE Workshop Athens, 19 April 2006
11
HellasGrid Infrastructure, Phase II, EKT (2/2006)
National Documentation Center (EKT) EGI SEE Workshop Athens, 19 April 2006
12
HG Local Users distribution per Discipline
EGI SEE Workshop Athens, 19 April 2006
13
CPU Hours per Site EGI SEE Workshop Athens, 19 April 2006
14
HellasGrid CA statistics:
EGI SEE Workshop Athens, 19 April 2006
15
CPU time: distribution of overall EGEE VOs usage of HG infrastructure
EGI SEE Workshop Athens, 19 April 2006
16
HellasGrid as part of European efforts
Scale > 170 sites in 39 countries > CPUs > 5 PB storage > concurrent jobs per day > 60 Virtual Organisations EGI SEE Workshop Athens, 19 April 2006
17
SEE Europe promoting the NGI/EGI model
NGI: National Grid Initiative Infrastructure oriented & application neutral Not driven by applications GRNET acts as an early champion for the SEE area One partner per country since EGEE Phase I! EGEE-SEE and SEE-GRID countries adopted the same model! EGI SEE Workshop Athens, 19 April 2006
18
Challenges/Experiences/Conclusions
Building the HG infrastructure proved difficult Housing, SLAs with local institutes are slow, tedious and expensive! Getting applications /users to exploit the infrastructure is slow! Training/education and dissemination is important Application projects and funding are essential! Received 45 proposals in last Grid-Applications call! Sustainability of the infrastructure and services Equipment will need to be changed after 3-5 years Local “incubators” for GRID technology needed: Experts in local sites Operators should have appropriate mentality (shifts, support) Gained a lot from networking experience (NOCs, NOC-ROC cooperation) Regional, Pan-European and International collaborations are vital Our European friends lead the way: Middleware, VOs, support projects EGI SEE Workshop Athens, 19 April 2006
19
www.hellasgrid.gr www.egee-see.org For more: mailto:fkara@grnet.gr
EGI SEE Workshop Athens, 19 April 2006
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.