LTCP and TN Cost Allocation
Briefing Materials LTCP and TN Cost Allocation Presented to: Blue Plains Technical Experts Working Group By: District of Columbia Water and Sewer Authority December 12, 2008
2
Purpose Prepare for Jan 7, 2009 CAO meeting
Present range of potential DC/suburban cost allocations for LTCP and TN based on WASA technical analyses
3
Bases for Cost Allocations
LTCP Differentiate between D.C.-only vs joint use projects Estimate suburban cost based on range of 6 to 12.7 % per Nov. 20, 2008 CAO meeting TN Estimate suburban cost based on 370 mgd IMA allocation Mixed LTCP & TN Identify use (volume, flow rate, etc.) for LTCP vs TN For LTCP: estimate suburban cost based on range of 6 to 12.7 % For TN, estimate suburban cost based on 370 mgd allocation
4
Mixed LTCP & TN - Facilities
Northeast Boundary Tunnel = LTCP = Mixed LTCP & TN Anacostia River Tunnel = Pure TN Blue Plains Tunnel 73 mg total ECF 225 mgd Tunnel Dewatering Pumping BP Enhanced Clarification 31 mg for TN - 170 mgd planned for LTCP 225 mgd needed overall 55 mgd for TN Required only for TN (Replaces 336 mgd excess flow facilities)
5
Enhanced Clarification Facility
Not required for CSO control – can meet WQS under LTCP without it Needed for TN Required for peak flow reduction so overall pollutant loads to river are less with peaking factor of 1.5 vs 2.0 for peak plant flows Key basis for EPA accepting plan
6
Overview of Costs and Categories
LTCP – DC Only $410.5 M LTCP – DC + Subs $1,322.1 M DC Only CSO Program $2,360.5 Other Projects $364.5 M DC + Subs CSO & TN $3,219.2 M Mixed LTCP & TN – DC + Subs $ M TN Program $858.7 Pure TN – DC + Subs $686.1 M
7
CSO Program – LTCP (DC Only)
8
CSO Program – LTCP (DC + Subs)
8
9
CSO Program – Other Projects
Examples: Pumping station rehabilitations Siphon cleaning Blue Plains influent sewer rehabilitations Procedures already established for determining: Joint use vs non-joint use Cost allocation
10
CSO Program – Other Projects
10
11
Mixed LTCP & TN - Facilities
Calculation of Percentages: Calculation of Cost: 11
12
Pure TN (DC + Subs)
13
Evaluate TN Savings for Current Plan vs
Evaluate TN Savings for Current Plan vs. No Change in Peaking Factor ($1.4 Billion Plan)
14
Summary Suburban Cost ($M) D.C. Cost ($M) Item Total Cost ($M) Low
High CSO Program (1) LTCP – DC Only $410.5 - LTCP – DC + Subs $1,322.1 $79.3 $167.9 $1,154.2 $1,242.8 TN Program Pure TN – DC + Subs $686.1 $403.3 $282.8 Mixed TN & LTCP $436.0 $117.3 $129.2 $306.8 $318.7 GRAND TOTAL $2,854.7 $599.9 $700.4 $2,154.3 $2,254.8 Note: 1. CSO Program costs not directly tied to LTCP are budgeted at $364.5 M. These costs are not included since they will be allocated using procedures already established.