1
Assembly procedure – Inner Region
2
Assembly procedure – Inner Region
Reminder : 1 2 3 4 5 6 From « Integration status and open issues» of 22/06/11 by M. Jore
3
Assembly procedure – Inner Region
Level 1 (1st assembly) SIT FTD 3 at 7 Inner Support Structure
4
Assembly procedure – Inner Region
Level 1 FTD 3 at 7 fixed and located on ISS (external mounting) FTD 3 at 7 Inner Support Structure Mechanical support (in red)
5
Assembly procedure – Inner Region
Level 1 « Supporting wheels » fixed and located on the ISS For the SIT (half part) For the FTD 1&2 SIT FTD 1 & 2 Inner Support Structure Mechanical support (in yellow)
6
Assembly procedure – Inner Region
Level 2 Vertex clamped around the Beam pipe To need a tools and a special support VTX Beam pipe
7
Assembly procedure – Inner Region
Level 2 Cables fixed on the Beam pipe With a clamp in « Epoxy » Cables (in red) Beam pipe Clamp in Epoxy
8
Assembly procedure – Inner Region
Level 3 Beam pipe with VTX assembled and located on the 1st assembly By cables or « striplines » or « tie rod » on the ISS
9
Assembly procedure – Inner Region
Level 4 Close the FTD 1 & 2 Located and fixed between half part Cables ? FTD 1 & 2
10
Assembly procedure – Inner Region
Level 5 Close the SIT (inner and outer) « Supporting wheels » Maybe FTD 3 ? Interactions with SIT ? Cables ? Cooling ? FTD 3
11
Assembly procedure – Inner Region
Level 6 Close the FTD 3 at 7 with ISS (same process) FTD fixed on the ISS ? (or not to see level 7) Cables ?
12
Assembly procedure – Inner Region
Level 7 Close the ISS Fixed beam pipe on the ISS ( to see level 3) Measures and controls
13
Assembly procedure – Inner Region
Conclusion Need informations : For SIT For FTD1&2 For the cooling Assembly procedure : Laser alignment Different support for the mounting A support to handle the beam pipe