Ferguson Slide Permanent Restoration Project
2
Where are we today? Limestone Salamander legislation (AB1973)
Forest Service Analysis for Impacts to Wild and Scenic Merced River Alternatives have been dropped from further consideration Draft Environmental Document
3
Limestone Salamander Legislation AB 1973
Signed into Law on July 13, 2012 Allows the California Department of Fish and Wildlife to issue a 2081 (Incidental Take Permit) for the Limestone Salamander. Sunsets on January 1, 2016 which requires us to begin Construction by this date.
4
Forest Service Wild and Scenic River assessment
All Bridge Alternatives would have Temporary and Long Term Impacts to Wild and Scenic River Tunnel (T-3) and Rockshed (R) Alternatives would not have Long Term Impacts to Wild and Scenic River Temporary Bridge permit expires in 2018
5
Alternatives Removed from Consideration
Alternatives were eliminated because of: Adverse Long Term impact to the Wild and Scenic River Adverse Impacts to 4(f) Resources (Incline Road Trail & Recreational Uses of the Merced River). Consensus for this approach was received from all participating Federal, State and Local agencies
6
Alternatives Moving Forward
7
Alternatives T3 and R
8
Photo Simulation Rock Shed
Stays on current alignment
9
Photo Simulation Tunnel
10
Project Schedule Circulate Draft EIR/EIS – Spring 2013
Public Hearing – Late Spring 2013 Final EIR/EIS – Fall 2013 Design Complete – Summer 2015 Begin Construction – Late 2015