Presentation is loading. Please wait.

Presentation is loading. Please wait.

SFT Group Meeting June 13th 2008

Similar presentations


Presentation on theme: "SFT Group Meeting June 13th 2008"— Presentation transcript:

1 SFT Group Meeting June 13th 2008
SFT Group News Pere Mato Highlights from CALOR Gunter Folger EVE as the base of AliEve and Fireworks event Matevz Tadel AOB

2 Staff Movements Arrivals Departures
Summer Students and Summer Visitors (see next slide) 2 new Technical Students and 2 new Fellows will start in September (see next slide) Departures Zoltan Torzsok will leave on 30th June

3 Summer Students and Visitors
Start End Name Supervisor Status Location 2-Jun-08 31-Jul-08 SLAWINSKA Magdalena RADEMAKERS Fons UPAS 32/R-C03 (Dell'Acqua’s office) 10-Jun-08 29-Aug-08 LEPAGE-JUTIER Arnaud FOLGER Gunter SUM 32/R-B15 (Visitor’s office) 11-Jun-08 11-Aug-08 DONG Xin APOSTOLAKIS John 32/R-B03 (Vladimir’s office) 23-Jun-08 8-Aug-08 MOUBARAK Maxime STAG 24-Jun-08 15-Aug-08 ERDOGAN Gencer NAUMANN Axel 32/R-C19 (Leandro’s desk) 1-Jul-08 ISHIDA Akira FOLGER Gunter (Stefan) 2/R-023 (Gunter’s office) 8-Jul-08 5-Sep-08 CERRILLO MORENO Javier RIBON Alberto JOERGENSEN Morten Dam ROISER Stefan KLEMER Steffen BUNCIC Predrag OPOCENSKA Katerina BELLENOT Bertrand 32/R-C09 (Zoltan’s desk) 26-Sep-08 PALKA Wieslaw 32/R-C19 (Diego’s desk) 4-Jul-08 17-Jul-08 COOPERMAN Gene 32/R-B06 (Ian’s desk) 1-Sep-08 DIEZ Victor TECH 32/R-C03 GASPAR Anna-Maria FELL 32/R-C07 SMITH Eoin INNOCENTE Vincenzo 16-Sep-08 GRACIA Roberto 32/R-C13

4 Offices (*) (*) Only indicating people with long-term occupancy Free
Perrin Torzsok Aguado Free Gonzalez Dziedziniewicz Kolet Free Free Folger (*) Only indicating people with long-term occupancy Nikitina Cosmo

5 Offices Free Ribon Free Uzhinskiy Genser visitors

6 Forthcoming Events CERN School of Computing IEEE 2008 NSS-MIC
25 August - 5 September 2008 in Gjøvik, Norway Kate and David will be participating IEEE 2008 NSS-MIC 19-25 October 2008 in Dresden, Germany Nobody from the group Geant4 Collaboration Workshop 6-11 October 2008 in Kobe, Japan 7 people from the Geant4 team ACAT 2008 3-7 November 2008 in Erice, Sicily

7 Group summary expenses – 2008
White paper project allocation 2008 : WP8 : 45 kCHF(fresh money) WP9 : 60 kCHF (fresh money) (*) not yet completed

8 Conference Rooms 32/S-C22 32/1-A24 Room has been refurbished
Painted, video projector, audio conference phone, power plugs,… 32/1-A24 Problems reported by other users (mainly LHCb) EVO scalability, undesired echo, unable to have audio and EVO conference at the same time Fault in the Polycom system, out of maintenance The Polycom system with be replaced by a Tandberg 770 system Standard system (CERN-wide) with remote control and monitoring The cost will be 6900 E (shared between LHCb, SFT,…) Try & Buy option

9 Desktop Forum Summary (1)
Last meeting June 10th Changes in the Mail Services messages/day, 98-99% spam New anti-spam system Migration to Exchange 2007 Webmail for non-IE browsers Management of white-black lists Pilot service this summer Changes in mailing lists e-Groups replacing “Simba” Archives in SharePoint Goal: end 2008

10 Desktop Forum Summary (2)

11 CERN Relay Race “Running Bugs” team 49th of 76
We left some room for improvement for next year!!

12 A.O.B Exceptional carry-forward of annual leave in the context of the LHC completion Staff members will be authorized to carry forward a maximum of 30 days of annual leave in addition to the usual annual ceiling of 30 days Subscriptions to various magazines have been organized MacTech, Linux Journal, Linux Magazine, Dr.Dobb’s Journal


Download ppt "SFT Group Meeting June 13th 2008"

Similar presentations


Ads by Google