1 Alpha – Project steps & common errors

2 Alpha – From planning to the installation
Inspection of building and roof Filling our the planning aids Input of project information in MS Quickconfigurator or forwarding of information to Mounting Systems GmbH Static check Choice of appropriate configuration Offer planning, bill of materials and documentation Placing the order Forwarding of graphic documentation (construction view) to the installer After goods receipt, inspection of components according to bill of materials Installing the system Stand

3 Overview mounting systems – Planning aids
Checklist for all relevant project information Data concerning the site Building data Configuration of PV system Attention: Roof construction important! Especially: Distance of rafters (irregularities?) Dimension of rafters Type of roof construction, tiles etc. Stand

4 Overview mounting systems – Advantages of the „Quickconfigurator“
Input of project description Determining of building data Definition of wind and snow load Module planning Choice of right components Construction view Complete bill of materials Print of all data and results, including verifiable static Stand

5 Alpha – Time division for the complete installation
Stand

6 Common errors – Generalities
Problem Consequence Error prevention Missing building data Incorrect combination of material, delay or stop of installation because of necessary reorders No static verification, no insurance coverage in case of damage Reduced durability, property damages Completing of planning aids before generation of bill of materials Subsequently modified configuration of project Inspection of project configuration on site (Attention: consider irregular position of rafters next to windows/chimneys etc.) Installation not according to planning Delivery of graphic dimensioning generated with the Quickconfigurator to the executive installer Inappropriate material: roof hooks, fixation material on rafter In case of an on-site meeting, measure tiles, height of battens, the distance to rafters and dimensions of rafters and calculate the material according to it. Installation faults Installation according to planning and manual Stand

7 Common errors – assembly faults
Fixing the roof hooks: No planning of shims Fixing of standard roof hooks with less than 3 screws No observance of edge distances in the rafter hook-arm putting pressure on the underlying tile Excessive rail-cantilever because of non-observance of planning data Removing roof tiles and cutting them: No replacement of old, fragile roof tiles below the roof hooks No or insufficient cutting of tiles, breakage of tiles during cutting Other installation faults: Wrong insertion of Quickstones Loose tightening of bolted connections Stand

8 Conclusion – Common errors
Error prevention through: Accurate input of building data, module dimensions etc. (planning aids) Utilization of the Quickconfigurator Correct planning information for the executing installer Check of delivered material prior to installation Necessary tools and additional material (shims, replacement tiles) on site Careful and correct installation according to planning and installation manual Ensuring the correct fixation of all screws A structured approach will give the installer / end customer the impression of professionalism! Stand