1 Infrastructure inventory and use
G.Vandoni SRF Coordination, 15th June 2017

2 INFRASTRUCTURES for SRF - INVENTORY
Surface & Heat treatments Warm inspections & tests Assembly & storage RF cold testing Degreasing Optical inspection Assembly on marble Vertical cryostat SM18 single cavity SUBU chem. etching Coarse tuning on bench Assembly, conventional Vertical cryostat Cryolab single cavity Bead-pull field profile Assembly, laminar flow "grey" EP light INFRASTRUCTURES for SRF - INVENTORY EP heavy Assembly, clean room ( ) Cryomodule horizontal bunker testing BCP light Assembly, clean room (100) BCP heavy Vac firing Storage, conventional Vac bakeout Storage, clean-room quality HPR Thin film coating

3 INFRASRTUCTURE INVENTORY DOCUMENT
Technologies Location Specification: sizes, forms, operational parameters Scope and physical limits Use, rate limits Space Location, surface Floor loading, ventilation Clean room class Use Foreseen evolution DRAFT INFRASRTUCTURE INVENTORY DOCUMENT A long DRAFT is under revision

4 INFRASTRUCTURE NEEDS by PROJECTS
INFRASTRUCTURES Surface & Heat treatments Warm inspections & tests Assembly & storage RF cold testing PROJECTS LHC consolidation LHC operation HIE-Isolde INFRASTRUCTURE NEEDS by PROJECTS HiLumi crab-cavities High gradient WOW cavities FCC Thin films R&D SRF R&D Couplers R&D

5 INFRASTRUCTURE MANAGEMENT
1718 SEASON INFRASTRUCTURE MANAGEMENT PROJECT NEEDS infrastructure management ≠ use of infrastructure by projects infrastructure use by projects is not 100% of infrastructure availability: maintenance, consolidation, etc are taken into account by the infrastructure manager for availability

6 COLLECTION OF PROJECT NEEDS

7 COLLECTION OF PROJECT NEEDS
Every project linkperson fills up to best knowledge the calendar of needs in infrastructure use

8 COLLECTION OF PROJECT NEEDS
Every project linkperson fills up to best knowledge the calendar of needs in infrastructure use

9 CALENDAR June 15th Distribution of sheets to linkpersons Summer 2017
Filling up the sheets September 1st Collection of needs completed Sept-Oct WP mini-reviews October 15th Analysis of needs completed 30th Nov/ 1st Dec SRF workshop CALENDAR