Download presentation
Presentation is loading. Please wait.
1
Design of TIDVG#4 A. Perillo-Marcone (EN-STI)
2
Current Dump at LSS1 – TIDVG#3
Section A-A Iron Shielding (EN-GJL-200) Copper Core (OFE, C10100 H02) Graphite: 2.7m (2020 PT) Aluminium: 0.8m (EN AW 6082 T6) Copper Tungsten: 0.3m (Densimet 180) B A Beam Section B-B Shielding Cooling pipes for shielding Beam opening Copper core (Envelope+blocks) Cooling circuit for copper core 15th July 2016 Design of TIDVG#4 – A. Perillo-Marcone 2
3
Design of TIDVG#4 – A. Perillo-Marcone
TIDVG#4 - Design CDD: SPSTIDV4XXXX Smarteam: ST * 15th July 2016 Design of TIDVG#4 – A. Perillo-Marcone
4
Design of TIDVG#4 – A. Perillo-Marcone
TIDVG#4 - Design Main modifications: Replacement of copper OFE by CuCrZr – less manufacturing time. The Aluminium blocks are removed. 15th July 2016 Design of TIDVG#4 – A. Perillo-Marcone
5
Design of TIDVG#4 – A. Perillo-Marcone
TIDVG#4 - Design Main modifications: Two cooling circuits. More reliable springs. The copper block is integrated into the core. 15th July 2016 Design of TIDVG#4 – A. Perillo-Marcone
6
Summary of Changes in TIDVG#4 with respect to TIDVG#3
Geometry of beam opening slightly modified inside the dump. Flanges at upstream/downstream ends are identical. Modified shape of vacuum chamber upstream/downstream of dump. Addition of SS vacuum chamber around the dump. Removal of aluminium block inside the dump Modification of lengths and materials inside the dump. 15th July 2016 Design of TIDVG#4 – A. Perillo-Marcone
7
Thank you for your attention.
8
Design of TIDVG#4 – A. Perillo-Marcone
15th July 2016 Design of TIDVG#4 – A. Perillo-Marcone
9
Design of TIDVG#4 – A. Perillo-Marcone
15th July 2016 Design of TIDVG#4 – A. Perillo-Marcone
10
Design of TIDVG#4 – A. Perillo-Marcone
15th July 2016 Design of TIDVG#4 – A. Perillo-Marcone
11
Design of TIDVG#4 – A. Perillo-Marcone
15th July 2016 Design of TIDVG#4 – A. Perillo-Marcone
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.