Presentation is loading. Please wait.

Presentation is loading. Please wait.

2012 budget report, draft budget request for 2013 and future outlook

Similar presentations


Presentation on theme: "2012 budget report, draft budget request for 2013 and future outlook"— Presentation transcript:

1 2012 budget report, draft budget request for 2013 and future outlook
CAST FRC-D 2012 budget report, draft budget request for 2013 and future outlook   Martyn Davenport 18 June 2013

2 2012 Budget report 4He High Sensitivity run 2012 budget report
Magnet operation costs 2012 The status of the CAST Common Fund end 2012 

3 Program for 2012 - 4He high sensitivity run
Remove 3He from CAST and store in transport bottle for shipment back to LLNL Thanks to TE-CRG cryolab! 2M$ 3He safely transferred and stored Cut trees to clear line of sight for sun filming Check alignment of XRT/CCD with laser (magnet warm) Sun filming Add 300 mbar 4He Cool-down magnet Insert new GRID in tracking/ test (1st time since 2002) Data taking 4He new GRID in tracking program Sun filming in September Upgraded system but weather poor Continued data taking End data taking start of intensive tests Last time He gas in cold bore Tests for CFD analysis & data anaysis Full survey GRID (aide and collaboration of CERN surveyors excellent record 3.5d) Remove SSMM detectors and check alignment XRT/CCD with laser (magnet cold) Forced warm up of the magnet to ambient temperature by mid-December Prepare to open cryostat early in 2013 before LS1

4 Contributions for the Phase IV are detailed in the table below.
2012 Budget report 2012 is the first year of the Addendum No4 concerning the Phase IV ( ) Contributions for the Phase IV are detailed in the table below.

5 Phase IV - Contributions table
Standard (kCHF) In-kind details ( ) Special (kCHF) Total Cash In-Kind Cash or in-kind (kCHF) 2012 2013 2014 CERN 20 15 Technical support 105 IRFU-Saclay, France 18 184 54 Greek Delegation 100 50 450 UP, Greece 30 304 90 UTH, Greece NCSR, NTUA, Greece 34 9 TU-Darmstadt, MPE UFRA, Germany 3.6 6 36 Mech wkshp (6,6,6), PANTER tests 58.8 MPP, Germany 5 Columbia U., USA DTU-Space, Denmark UD, Turkey 104 U Bonn, Germany INR, Russia LLNL, USA 154 45 UBC, Canada Mech & Elec wkshp RBI, Croatia UZ, Spain 27 Staff at CERN 84 UT, Italy MPS, Germany 10 TOTAL 216.6 246.6 64 94 37 88 1138.8 Cash+ In Kind + Special =Average of 380 kCHF / year

6 2012 -2014 Manpower and Team leaders
Institute Team leader Physicists Minimum annual contribution assuming 5k/PhD (CAST contact) [kCHF] CERN M. Davenport 4 20 IRFU-Saclay, France I. Giomataris 3 15 UP, UTH, NCSR, NTUA, Greece K. Zioutas 7 35 U Bonn, Germany K. Desch 2 10 TUD, Germany D. Hoffmanm UFRA, Germany J. Jacoby 1 5 MPP, Germany G. Raffelt UD, Turkey S. A. Cetin INR, Russia S. Gninenko DTU-Space, Denmark F. Christensen LLNL, USA M. Pivovaroff UBC, Canada M. Hasinoff Columbia U, USA C. Hailey RBI, Croatia M. Krcmar UZ, Spain I. Irastorza 6 30 UT, Italy G. Cantatore MPS, Germany S. Solanki TOTAL  41 205

7 Status end 2011 Balance 137.4 kCHF
Outstanding contributions kCHF To be carried on into Institute  Outstanding end 2011 (kCHF) CERN 4.9 IRFU-Saclay, France Greek Delegation 50.0 UP, Greece UTH, Greece NCSR, NTUA, Greece TU-Darmstadt, MPE UFRA, Germany 5.2 MPP, Germany 1.4 Columbia U., USA DTU-Space, Denmark UD, Turkey 10.0 INR, Russia LLNL, USA 7.6 UBC, Canada 5.0 RBI, Croatia UZ, Spain 21.6 UT, Italy 0.1 MPS, Germany TOTAL 105.8 

8 Contributions 2012 Contributions in 2012:
CASH kCHF (plus kCHF reimbursements) In-kind contributions kCHF Total for kCHF (compared to kCHF promised in Add No 4) Over-page details of contributions

9 Actual contributions in 2012 (kCHF)
Addendum No 4 for 2012 (kCHF) Actual contributions in (kCHF) Add. No 4 minus Actual Contrib. (kCHF) Institute Standard Special Total Cash in-kind Cash or in-kind 2012 CERN 20 15 35 0.0 75.1 -40.1 IRFU-Saclay, France 18 18.0 Greek Delegation 100 50 150 25.0 125.0 UP, Greece 30 51.7 -21.7 UTH, Greece 5 5.0 NCSR, NTUA, Greece 3 3.0 TU-Darmstadt, MPE UFRA, Germany 3.6 6 9.6 3.6# 1.55 5.2 4.4 MPP, Germany Columbia U., USA DTU-Space, Denmark UD, Turkey 10 10.0 U Bonn, Germany INR, Russia 6.0 LLNL, USA 4.9 10.1 UBC, Canada RBI, Croatia 15.0 UZ, Spain 27 10.0* 37.0 -10.0 UT, Italy 1.3 3.7 MPS, Germany TOTAL 217 64 88 368.6 118.3 109.9 228.1 140.5

10 Expenditure 2012 Expenditure reached 86% of the 2012 Budget estimate
Over-page details of expenditure M&O A 2012 2012 Budget estimate (kCHF) Actual expenditure General M&O Industrial services and subsistence 163 194.2 Experimental operation costs 105 81.0 Experimental upgrades Common Investments 47 20.6 Low energy detector and window development 4 0.0 MFB platform 8 0.1 Total 327 295.9

11 2012 detailed budget versus actual expenditure
2012 GENERAL M&O budget actual a) Industrial services and subsistence 1 Students 34 60.3 2 Spokesman 60 59.8 3 External support for CFD 52 55.4 4 External support for Slow Control 11 15.7 5 Mechanical support (FSU) 6 3.0 Total 163 194.2 b) Experimental operation costs 7 Stores 8 10.5 Cars 12 10.6 9 Phones/printing/transport costs 6.5 10 Gas/cryo liquids 0.0 Epool 14 15.8 Mechanical workshops and materials (CERN plus Institutes ) 13 Subsistance/expenses (data taking) 4.7 GRID 15 Aid for breakdown in detector subsystems 5.4 16 Slow Control(computers/monitors/tapes) 3.3 17 Repairs, maintenance on pumps& gauges & RGA 7.3 18 Mechanical movement maintenance & running costs 19 Electrical work and cabling workshop 1.1 20 Safety 0.8 21 Divers(vacuum cleaning/ cleaning/ outreach/ courses/ trips /Patras wksp grant) 1.5 22 Payment AB for FSU for power converter +3He PLC maintenance 5.0 23 Contract with ABB (6k + contigency for call outs) 8.6 24 105 81.0

12 2012 detailed budget versus actual expenditure (cont.)
Experimental upgrades 2012 a) Common Investments 25 Vacuum run Windows, wedges to straighten MFB pipework 6 0.0 26 Windows tests in x-ray beam (PANTER?) 2 27 Webcam System/sunfilming upgrades/alignment monitors 5 1.2 28 3He standby maintenance and eventual system removal 29 3He system to refill LLNL bottle and shipment back to LLNL 10 7.9 30 Tree clearance for sun filming 1.9 31 Instrumentation (load pin displays) 1.0 32 Cable replacement and contribution to cryo repairs 8 8.6 33 Storage/ barrack outside SR8 for (e.g. Barbe/INGRID/LLNL-XRT) 34 Intervention to open or close cryostat 4 35 Scaffolding for interventions 3 36 sub total 47 20.6 b) Low Energy Detector and Window development 37 Support physicists for studies and calculations new physics 38 Support for Low Energy detector R&D and tests 39 Low Energy Windows, prototypes and tests 40 c) MFB Platform 41 Design - new loading calculations, study to strengthen XRT platform. 0.1 42 Design, integration of vacuum lines and vacuum interfaces to some detectors 43 New MFB XRT platform or strengthening of the existing one 44 Mechanical work for mounting new instruments/shielding on CAST 45 Electrical work & cabling on new instruments/new detector 46 Total 59 20.7 48 Grand Totals 327 295.9

13 Outstanding contributions end 2012
Institute Outstanding Contributions end 2011 (kCHF) Add No Actual contribution Add No 4 - Actual Contribution + Outstanding (kCHF) Total Outstanding Contributions 2011 2012 CERN 4.9 -40.1 -35.2 IRFU-Saclay, France 0.2 0.0 Greek Delegation 50.0 125.0 175.0 UP, Greece -21.7 UTH, Greece 5.0 NCSR, NTUA, Greece 3.0 TU-Darmstadt, MPE, UFRA, Germany 5.15 4.4 9.6 MPP, Germany 1.4 6.4 Columbia U., USA DTU-Space, Denmark UD, Turkey 10.0 20.0 U Bonn, Germany INR, Russia 6.0 LLNL, USA 7.6 10.1 17.7 UBC, Canada RBI, Croatia 15.0 UZ, Spain 21.6 -10.0 11.6 UT, Italy 0.1 3.7 3.8 MPS, Germany TOTAL 105.95 140.5 246.4 303.3

14 M&O B a) a) Detector & sub-system M&O Institute X-ray detector or
X-ray detector M&O sub-system 2012 [kCHF] IRFU-Saclay, France M&O existing detectors 10.3 TU Darmstadt, Germany Two NAS systems for DAQ & storage system at TUD. Pump repairs 7.1 UZ, Spain Support and maintenance of MM detectors 10.0 U Bonn, Germany InGrid integration visits to CERN 1.5 CERN, Switzerland X-ray Lab consumables and Epool 7.0 U Patras, Greece Nano windows 4.0 TOTAL  39.9

15 M&OB b) Detector & subsystem investment, development, construction, testing, installation & alignment. Quite large investments made… Institute X-ray detector or X-ray detector M&O sub-system [kCHF] IRFU-Saclay, France X-Y micobulk MM 1.2 UZ, Spain Construction , installation of new SSMM setup in 2012 38.4 U Bonn Investment in new InGrid (detector, HV+gas system, DAQ 24.1 CERN, Switzerland Sample manipulator design , Amptek SDD detector, filter holders, target foils, vacuum, PS for large SDD, XY microbulk MM 30.3 U Patras Nano windows 11.0 TOTAL  105.1

16 Summary M&O A & B Contributions 2012
Total contributions in 2012 were kCHF Category 2012 Fraction [kCHF] Category A (I) 118.3 0.32 Category A (II) 109.85 0.29 Category B (a) 39.9 0.11 Category B (b) 105.1 0.28 Total 373.1 1.00

17 Magnet Operation in 2012 Actual values Projected values Item Dept 2011
2011 2012 2013 2014 Units Cryogenics M&O EN (kCHF) 180 Cryogenics power (hours) 2951 4877 4380 6570 81 134 120 181 Power Converter power 797 1576 1445 2168 6 11 10 16 FSU maintenance (TE) CAST 5 Yearly TOTAL CERN 267 325 311 376

18 Status Common Fund end 2012 Balance 69.9 kCHF
Outstanding contribution kCHF Balance was low Prefer to keep a buffer of >100kCHF Outstanding Contributions extremely high Main causes: Institutes awaiting signing of Add No4 Financial constraints at home

19 Draft Budget request 2013 Schedule 2013 Draft Budget request
Experimental Program Draft Budget request Overall financial situation

20 Schedule 2013 Start the repair of the helium gas leak from the cryogenics cooling circuit on top of the MFB losing 60m3/day of cold 4He gas – the escaping gas mostly recovered to balloons) Open the MRB end of the cryostat & slide back the large MFB bellows Thanks to TE-CRG Separate the 3He gas lines from the cold bore Remove the x-ray cold windows Replace with open flanges linking cold bore vacuum to detector lines Add new temperature probes to improve magnet temperature monitoring Strengthen welding of XRT platform to accommodate new heavy shielding Thanks to EN-MME Dismount definitively the pn-CCD detector Close up the cryostat Pump down cryostat - 10 days ago Some small leaks but eventually cured without reopening Thanks Jean-Michel Laurent (TE-VSC retired)  Today !

21 Schedule (cont) Complete mechanical repairs on cryogenic compressors (TE-CRG) – vibration problems Dismount the MPE XRT and send to PANTER for calibration Cool magnet- mid July Test magnet 13kA , then magnet temperature systematics tests (new temp probes) Install new SRMM detector and new heavy shielding Install Low Energy detector(s) on vacant beam port Full survey GRID measurement (counterweights to simulate loading when data taking) 3-4 weeks Solar tracking (tests & or data taking) with Low Energy detector(s) and SRMM (also SSMM (S5)) Reinstall MPE XRT Realign XRT with laser Install new InGrid detector on XRT and align both together Commission InGrid and also install the SSMM with new VETO counter at the other end Commission all detectors Short data taking run in November (The new XRT from LLNL will not be installed in 2013)

22 Draft Budget Request 2013 Budget to fulfil schedule above
Reduced from 355 kCHF (in Add No4) to 301 kCHF In order to take account of changes in planning Calibration of existing XRT late in the year No installation of new XRT in 2013 Reduced data taking period Less subsistence required In 2012, the expenditure was very similar ………at 296 kCHF Detailed budget request over-page (compare to Add No4 ) M&O A 2013 2013 Budget Request [kCHF] Industrial services and subsistence 76 Experimental operation costs 130 Common investments 47 Low Energy detector and window development 14 MFB platform 34 Total 301

23 Detailed 2013 budget request
2013 GENERAL M&O Add 4 FRC a) Industrial services and subsistence 1 Students 37 2 Spokesman 60 30 3 External support for CFD 6 4 External support for Slow Control 12 5 Mechanical support (FSU) Total 127 76 b) Experimental operation costs 7 Stores 16 8 Cars 9 Phones/printing/transport costs 10 Gas/cryo liquids 11 Epool Mechanical workshops and materials (CERN plus Institutes ) 13 Subsistance/expenses (data taking) 14 GRID plus XRT alignment 15 Aid for breakdown in detector subsystems Slow Control(computers/monitors/tapes) 17 Repairs, maintenance on pumps& gauges & RGA 18 Mechanical movement maintenance & running costs 19 Electrical work and cabling workshop 20 Safety 21 Divers(vacuum cleaning/ cleaning/ outreach/ courses/ trips /Patras wksp grant) 22 Payment AB for FSU for power converter +3He PLC maintenance 23 Contract with ABB (6k + contigency for call outs) 24 136 130

24 Experimental upgrades b) Low Energy Detector and Window development
2013 Experimental upgrades Add 4  FRC  a) Common Investments 25 Vacuum run Windows, wedges to straighten MFB pipework 2 26 XRT test in x-ray beam (PANTER) 5 30 27 Webcam System/sunfilming upgrades/alignment monitors 28 3He standby maintenance and eventual system removal 4 29 3He system to refill LLNL bottle and shipment back to LLNL Tree clearance for sun filming 31 Instrumentation (load pin displays) 32 Cable replacement and contribution to cryo repairs 33 Storage/ barrack outside SR8 for (e.g. Barbe/INGRID/LLNL-XRT) 7 34 Intervention to open or close cryostat 35 Scaffolding for interventions 36 sub total 38 47 b) Low Energy Detector and Window development 37 Support physicists for studies and calculations new physics Support for Low Energy detector R&D and tests 6 39 Low Energy Windows, prototypes and tests 40 14 c) MFB Platform 41 Design - new loading calculations, study to strengthen XRT platform. 42 Design - integration of vacuum lines and vacuum interfaces to some detectors 43 New MFB XRT platform or strengthening of the existing one 16 10 44 Mechanical work for mounting new instruments/shielding on CAST 8 45 Electrical work & cabling on new instruments/new detector 46 Total 92 95 48 Grand Totals 355 301

25 Overall Financial Situation
Addendum No 4 signing phase - ~ 60% Institutes have signed (see overpage) Only 59.5 kCHF in Cash Contributions in 2013 so far due to late completion of Add No 4 At the end of 2013 with no further Contributions to the Common Fund… Balance will be -116 kCHF We will come back to this in the financial outlook for Phase IV (kCHF) Balance start of 2013 69.0 All Cash Contributions in 2013 (see table 10) 59.5 Total 128.5 Expenditure 55.0 Balance 11 June 2013 73.6 Outstanding Commitments 11 June 2013 19.4 Estimated still to spend to end of 2013 170.0 189.4 Estimated balance end 2013 no further contributions -115.8

26

27 Overall Financial Situation
Addendum No 4 signing phase - >60% Institutes have signed (see overpage) Only 59.5 kCHF in Cash Contributions in 2013 so far due to late completion of Add No 4 At the end of 2013 with no further Contributions to the Common Fund… Balance will be -116 kCHF We will come back to this in the financial outlook for Phase IV (kCHF) Balance start of 2013 69.0 All Cash Contributions in 2013 (see table 10) 59.5 Total 128.5 Expenditure 55.0 Balance 11 June 2013 73.6 Outstanding Commitments 11 June 2013 19.4 Estimated still to spend to end of 2013 170.0 189.4 Estimated balance end 2013 no further contributions -115.8

28 Future Outlook – Vacuum Running
Experimental Program - Phase IV Financial Outlook for Phase IV

29 Experimental Program - Phase IV
2013 XRT support platform Strengthened to accept the 750kg of extra shielding.  New detectors & Upgrades: New SRMM, culmination of a long development for CAST – perhaps nearing the ultimate background levels for this type of detector on CAST. Small delays in construction but will be installed and ready by end August 2013 InGrid detector with outstanding potential both at sub-keV and keV energies, will need extensive commissioning as the CAST environment is hostile compared to the laboratory. Integration with the safety interlocks of XRT vacuum system is non-trivial will be mainly for commissioning. The SSMM will have a quasi-complete veto counter coverage - which should bring the background down to the effective minimum for this generation of MM and better than the existing XRT-pnCCD.

30 Experimental Program - Phase IV
Optics The existing MPE- XRT will be recalibrated at PANTER down to low energies (necessary for sub-keV Physics) It was unfortunate that the access to PANTER is late in 2013 but we are very fortunate to have any access at all in 2013 (thanks to H Brauninger). MPE-XRT ready for alignment in CAST by early October Then together with InGrid for a new campaign of measurements .  CAST foresees operating with 2 XRT’s for the first time but the new XRT for the SR side is now not due in CAST until mid-2014  In view of the changes to the delivery times of Detectors and Optics: CAST will adjust the schedule to maximise the time to test and commission detectors whilst awaiting the final complement of detectors and Optics. In particular, CAST intends to exploit the month of September 2013 for first LE tests & data taking Test one or more sub-keV detectors using the vacant beam ports of CAST whilst the XRT is calibrated. This will provide a first look in the sub-keV range. Candidates for these tests include a SDD detector and the InGrid if ready, In parallel the new SRMM (and perhaps the SSMM) can be commissioned in realistic conditions.

31 Experimental Program - Phase IV
CAST in 2014 The final schedule for the year 2014 depends on the new XRT calibration (and LE test runs and data taking in 2013) Currently, XRT calibration scheduled for May-June We will try to advance it.  5-7 months data taking should be possible (but only 3 months with the new XRT). Which is to be compared with 9 months planned for the axion physics in Phase IV of CAST. This may therefore necessitate a future request for further running in 2015. 2014 will be a very heavy year for CAST LS1

32 Financial Outlook for Phase IV
First consider the contribution so far in 2013 Estimated extra spending to end 2013 ~ (170kCHF +19.4kCHF commitments) To restore CAST finances back to our model of 100kCHF buffer at the end of 2013: Need Additional Contributions of kCHF CAST should be able to an achieved this easily with: Either the Outstanding Contributions from end 2012: Outstanding Contributions (OC) start of k CHF OC on (now repayments by GD(25k) and UZ(10k)) kCHF Or Total Contributions still outstanding from the year 2013 ~ 280 kCHF Date Institute Income (kCHF) Comments Greek Delegation 25.0 [2011] Now 2011 paid 100/100kCHF MPP 5.0 [2013] (2012 will be paid) TUD 3.32 [2013] U. Bonn 20.0 [2012 & 2013] U. Patras 3.73 2.49 Total 59.55

33 Conclusions CAST has accumulated some delays in the quite ambitious transformation into Phase IV 2013 will be largely commissioning new or upgraded systems with a few weeks –> 1 month axion/LE data taking possible November/December. There could also be 3-4 weeks of ‘first look’ at the sub-keV region in September At the end of 2013 CAST will have 3 out of 4 beam-lines fully commissioned In 2014 we will take data on Axions and Chameleons awaiting the arrival of a second XRT After its integration we will have 3 or more months data taking with the full complement of detectors. We had planned for 9 months. In order to make this possible….. Add No 4 needs to be pushed to completion

34 a little like the punishment of Sisyphus All Institutes are urged to:
Add No4 Completing Add No 4 ……… …..feels to me at least, a little like the punishment of Sisyphus All Institutes are urged to: Complete the signing of Add No 4 Remove this obstacle, Start sending in contributions Both past & present Let the Physics Program begin Properly funded and supported

35 Thank you for your attention

36

37 Greek Delegation Contributions - history
Add No 2 Add No 3 Add No 4 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 Promised 100 150 Payments 76.4 36.3 50 25 total 212.7 300 At present date: Contributions for 2012 (150kCHF) and 2013 (150kCHF) are outstanding

38

39

40 Completing Add No 4 – felt like …… ………the punishment of Sisyphus
All Institutes are urged to: Complete the signing of Add No 4 Start sending in Contributions (past & present ) So that the Physics Program Can be well funded and supported Add No4


Download ppt "2012 budget report, draft budget request for 2013 and future outlook"

Similar presentations


Ads by Google