Presentation is loading. Please wait.

Presentation is loading. Please wait.

Research Organisation Subgroup June 1, 2017

Similar presentations


Presentation on theme: "Research Organisation Subgroup June 1, 2017"— Presentation transcript:

1 Research Organisation Subgroup June 1, 2017
Researchfish Research Organisation Subgroup June 1, 2017

2 Agenda Time Item Person 10:00 Welcome & Introductions Gavin Reddick
10:10 Funders User Group update & actions Steven Hardy 10:20 Interoperability Work 10:50 Update on development programme Sean Newell 11:20 RO Focus Group Update 11:30 Governance: User Group Changes 11:40 Agenda items for the next meeting        All 11:50 Any Other Business 12:00 Close

3 Funders User Group Update

4 Q1 Submission Period 2017 Q1 Submission Period 2017
Interoperability Update

5

6

7

8

9 Interoperability Phase 2 Pilot
Process split into Validation and Decision Data Exchange – Universities Excel Template using agreed structure 24 hour turnaround time target Processed around 20 submissions, mainly in second week Different ROs took different approaches Standardised “error messages” Validation failures Fuzzy logic alerts Improved and refined process over the 2 week period Summary of the pilot phase 2 information exchange with ROs – November 2016

10 Distribution of decisions for valid records by RO

11 Interoperability Phase 2: Attributions by Year

12 The number of publications added from the 6 ROs in the November 2016 update (for all funders all publication years) was contrasted with the number of publications remaining at the end of the 2016 submission period (10 funders, publication year 2015 or 2016)

13 Following the 2016 submission period the number of publications added for the 6 ROs and 10 Funders participating in the pilot, where the publication year was 2015 or 2016, was analysed by RO/Route to produce the above graph

14 The second phase of the pilot includes a wider range of funders and for 4 of the ROs the overall number added by the end of the submission period is higher in absolute numbers than Phase 1, but 2 of the ROs have had fewer publications added during the submission period

15 Every RO has a higher proportion from CRIS in Phase 2

16 Every RO has a higher proportion from Harvesting publications in Phase 2

17 Preloaded publications make up a greater proportion of publications reported across all 6 of the ROs, though Edinburgh and St Andrews also have fewer publications overall

18

19 Disattribution Sometimes publications attributed to an award are subsequently disattributed. Publications added either from publication attributions or the pilot were monitored. Overall 4% of publications added as part of the December interoperability pilot were removed by the end of the 2016 Data Submission Period. No difference in disattribution rates from publication and CRIS records. Some variation in disattribtion rates between pilot institutions but very low absolute numbers.

20

21 The higher rates at Imperial seem to be a function of backfilling (see next slide)

22 Disattribution rates are generally lower for more recent records

23 Compared to Phase 1 Cambridge and St Andrews have lower rates, though the other ROs have higher rates

24 Disattribution rates higher for Phase 2 CRIS though with low absolute numbers, relative to harvested publications

25 New Developments High level award types Activity Page Altmetric Integration

26 High Level Award Types Based on the same types used to classify Further Funding Research grant (including intramural programme) Fellowship Studentship Capital/Infrastructure (including equipment) Travel/small personal Other

27

28 Altmetric Integration
Reporting Beta 0.3 Release High level award types Super Search Activity Page

29 Development Plan Three main themes for the year: e-Val redesign
Interoperability Data Quality/Integration

30 e-Val Redesign 2016 redesign of PI Interface was very positively received. 2017 redesign of e-Val will improve admin experience, make existing tasks easier, add new functionality, and lay foundation for further additions. Streamline/Simplify Tabs and options Finish Reports (Beta) More charts/tables/options Support for data sharing pool Data Export Improvements Super Search

31 e-Val Redesign: Data Export Improvements
Deferred Download New format data exports New data in exports e.g. F1000, ORCID, DOAJ New export types Data Dictionary

32 e-Val Redesign: Super Search
The purpose of the super search is to enable the user to have a single place to query their data. It is important that the search is fast, powerful and flexible. Users should be able to: Search all their data (including shared data) with a single search. Use simple search syntax – e.g. exact, wildcard Create compound searches with multiple conditions. Lock and pivot searches e.g. Show all publications produced by awards with policy influences with “mouse” in the text. Search live data and previously submitted versions. See awards linked to an output and use them as links to those awards’ details. Select a subset on the search results and perform actions on that subset – e.g. pivot, create a custom award group, add them to a “case study”, export the results

33

34

35 Create Custom Award Group Export Results
Super Search Pivot Search Create Custom Award Group Export Results Case Study Builder Entry Workflow Data Flagging Workflow

36 Interoperability Implementation of Publication with Unique ID upload for Research Organisations – targeting November 2017 release Implementation of improved routine publication harvesting. Continue to investigate other sources/types of data suitable for interoperability. Next steps?

37 Data Quality/Integration
Data Quality/Integration Locations – Links to external location datasets (Fundref, Companies House equivalents, etc.) Publications – Enhanced metadata, open access and beyond Spin Out Companies Research Materials – Databases and Models Research Materials – Tools and Methods Software and Technical Products Artistic and Creative Products Intellectual Property

38 RO Focus Group Update

39 Governance Changes

40 Agenda Items for Next Meeting

41 Any Other Business? Close


Download ppt "Research Organisation Subgroup June 1, 2017"

Similar presentations


Ads by Google