Proposed Warrant Article Regarding Improvement Dredging in the ACEC
2
Improvement dredging prohibited in ACEC
Concerns about access heightened by 2007 inlet formation ‘08 RMP Update: examine need, impacts & regulatory issues Background report: results of 2 years of study & basis for recommendation
3
Evidence of Need: -Hydrographic survey: channels passable but some areas worsened by lower low tides -Inlet configuration study: southerly migration & continued dynamic change in the area around the inlet -Allowed us to Identify area of greatest potential change within ACEC
4
Area of potential improvement dredging follows traditional channels
Limited to area that is most likely to be directly affected by inlet dynamics
5
Resource Impacts Shellfish Resources: assessment during environmental permitting
6
Resource Impacts Eelgrass Resources - assessment during environmental permitting
7
Regulatory Issues 3 areas of state regulation: Best options:
Chapter 91 prohibition Wetlands Protection Act review Water quality certification Best options: Variance from state regulations Change in state regulations Either requires RMP amendment
8
RMP Amendment Identify conditions under which permit could be sought:
Municipality/public purpose Within designated zone Maintain/restore historic navigation access Minimum dredging necessary to maintain access Amendment clears pathway (not a proposal) All environmental reviews still needed
9
Process Outreach meetings Seeking TM approval in all four towns
Seeking Selectmen endorsement of the TM warrant article