Download presentation
Presentation is loading. Please wait.
Published byRolf Parsons Modified over 6 years ago
2
Begin Project End Project Welcome to the SR 530/US 192 Highway Improvement Project Informational Meeting Thursday, February 8, 2007
3
Technical Coordinating Team
Florida Department of Transportation Mr. Joel Marmie, P.E. – Project Manager
4
Authority The Financial Project Number for the project is: This public meeting is being held in accordance with Chapter 120, Florida Statutes.
5
Authority (Continued)
This project is being developed in accordance with the Civil Rights Acts of 1964 and Under Title VI and Title VIII of the Civil Rights Acts, any person(s) or beneficiary who believes they have been subjected to discrimination because of race, color, religion, sex, age, national origin, disability, or familial status may file a written complaint with the FDOT's Equal Opportunity Office, 605 Suwannee Street, MS 65, Tallahassee, Florida (850) Consider taking this slide out and including it with a “Fact Sheet” at the sign in table
6
PROJECT DESCRIPTION Consider taking this slide out and including it with a “Fact Sheet” at the sign in table Completes the missing segment of the four lane to six-lane widening project between the Orange/Lake County line and Secret lake Drive.
7
PROJECT DESCRIPTION Consider taking this slide out and including it with a “Fact Sheet” at the sign in table Two ponds within the limits of the project will be enhanced and upgraded.
8
PROJECT DESCRIPTION Consider taking this slide out and including it with a “Fact Sheet” at the sign in table Two ponds within the limits of the project will be enhanced and upgraded.
9
Project-Specific Recommendations:
Swales on the outside right-of-way
10
Project-Specific Recommendations:
Curbs and gutters in the median
11
Project-Specific Recommendations:
Sidewalks will be constructed on both sides of the highway.
12
Project-Specific Recommendations:
A new traffic signal at Secret Lake Drive
13
Project-Specific Recommendations:
A new traffic signal at Secret Lake Drive
14
Median Opening Modifications
Camping Connections RV Store From Full Median Opening to EB/WB Directional Opening
15
Median Opening Modifications
West Driveway of Westside Development WB Directional to EB/WB Directional
16
Median Opening Modifications
Osceola County Firestation Full Opening to WB Directional, with full access for emergency vehicles; No EB U-Turns
17
Median Opening Modifications
Howard Johnson Maingate Resort Close full access
18
Median Opening Modifications
Pizza Hut/Lighthouse Key Close full access
20
SR 530/US 192 Highway Improvement Project FIN: Florida Dept. of Transportation FOR ADDITIONAL INFORMATION ABOUT FDOT PROJECTS AND PROGRAMS
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.