Download presentation
Presentation is loading. Please wait.
Published byRalph Palmer Modified over 6 years ago
1
See page 2 for how the above data looks in the SV-9 Report.
The SV9 requires a ‘SV-9 Technology Forecast’ record that is linked to it one or more ‘Technology Service Areas’ which in turn have linked to them one or more ‘Technical Services’ See page 2 for how the above data looks in the SV-9 Report. Apr 2006 DoD EA Dip Cse - SV9
2
UAV Target Data Collection and Dissemination
Storage: Tech. Services Short Term Mid Term Long Term Operating System Time: 6 to 18 Months Confidence: Moderate Forecast: Market changes already occurring move to Visa Time: 18 months to 2 years Confidence: High Forecast: New OS such as Visa established as the market default Time: Greater than 2 years Confidence: Moderately High Forecast: Replacement for Visa or open source now established as default Time: 6 to 12 Months Forecast: No change Time: 12 to 18 Months Confidence: Confident Forecast: No change but new capabilities on the market Time: 18 Month to 3 Years Confidence: Expected but TBC in next 12 months Forecast: New Capabilities required to be implemented to remain compatible with others Graphical Confidence: high Forecast: no change Time: 12 months to 2 years Forecast: new capabilities on the market Time: greater than 2 years Confidence: Low Forecast: Move to holographic products Apr 2006 DoD EA Dip Cse - SV9
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.