The SPE Foundation through member donations
Primary funding is provided by The SPE Foundation through member donations and a contribution from Offshore Europe The Society is grateful to those companies that allow their professionals to serve as lecturers Additional support provided by AIME Society of Petroleum Engineers Distinguished Lecturer Program
2
Shale Well Performance Metrics
Jim Crafton Performance Sciences, Inc. Society of Petroleum Engineers Distinguished Lecturer Program
3
S uccessful H orizontals A nd L ucrative E conomics
A Goal Statement S uccessful H orizontals A nd L ucrative E conomics
4
An “Overview”
5
Moving down the “size” scale
Courtsey: Stolper Geologic, Inc.
6
Some Horizontal Well Issues…
Overflush Required for Staging (19)* Interfacial Tension Management, “pITM” (518) Delay to First Production (320) Rate of Change of Wellhead Pressure (28) Shut-Ins (277) Proppant Conductivity (353) Artificial Lift Installation (103) Darcy’s Law 1856 * - Number of Wells in Sample
7
A Performance Comparison, Day 0
8
Day 1
9
Day 2
10
Day 3
11
Day 4
12
Day 5
13
Day 6
14
Day 7
15
Day 8
16
Day 9
17
Day 10
18
Day 11
19
Day 12
20
Day 13
21
Day 14
22
Day 15
23
Day 16
24
Day 18
25
Day 20
26
Day 23
27
Day 26
28
Day 30
29
Day 35
30
Day 40
31
Day 45
32
Day 50
33
Day 60
34
Day 70
35
Day 80
36
Day 90
37
Day 100
38
Flow Area Helps!!!
39
Any Physical Evidence? 77% Probability the pITM wells perform differently than the non-pITM wells do. pITM Non-pITM
40
The RPI® Analysis Slope = 1/ Transmissibility
Elevation ~ Apparent Frac Length
41
Gotta do wha’cha gotta do…
42
Effect of Delaying Production Start
43
Finally! Got it on production
44
A Sequence of Four Shut-ins
45
Shut-ins are NOT always Harmful
46
Does the length of Shut-in Matter?
47
Well, get it on pump!
48
You really do need the “good stuff”
49
Cumulative Impact for a Year
103 Wells 277 Wells 320 Wells 518 Wells
50
The Sum of the Effects… Working Fluid Minimization is Important
Start Production Quickly Gentle Drawdown Use Shut-ins wisely Duration of Shut-in doesn’t matter Artificial Lift Installation is generally harmful
51
100 Mesh is NOT a proppant!!! But MOST Importantly…
Manage Interfacial Tension Persistently 100 Mesh is NOT a proppant!!!
52
Your Feedback is Important Click on: Section Evaluation
Enter your section in the DL Evaluation Contest by completing the evaluation form for this presentation : Click on: Section Evaluation Society of Petroleum Engineers Distinguished Lecturer Program
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.