Download presentation
Presentation is loading. Please wait.
1
Dworshak FPOM Tour March 8, 2017 File Name
2
Runner and cone
3
Turbine runner
4
Turbine runner above, standing in start of draft tube
5
Wicket gate
6
Looking through wicket gate to runner
7
Wicket gate seal
8
Intake conduit for unit
9
Oxygen depress system
10
The big wrench
11
Manual operations control area
12
Crane rail limits access to slot area behind tail logs
13
Tailrace with unit 1, 2 operating
14
Tanks used for moving fish during unit salvage operations
15
Fish release pipe hooks to tank and delivers fish to tailrace
16
Spill through regulating outlets and pipeline for hatchery
17
Angler hooks a steelhead along fishing wall below the dam
18
Tailrace area showing tail logs, crane
19
Forebay
20
North Fork Clearwater from top of dam
21
Spillgate
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.