Presentation is loading. Please wait.

Presentation is loading. Please wait.

WP1 - INERTIA Framework Requirements, Specifications and Architecture

Similar presentations


Presentation on theme: "WP1 - INERTIA Framework Requirements, Specifications and Architecture"— Presentation transcript:

1 WP1 - INERTIA Framework Requirements, Specifications and Architecture
D1.2 – User and Business Requirements Specifications Resubmission ENG

2 BS Status Proposed Business Scenarios BS-01 - BS02
Qualitative  Business Case – A plenary meeting Quantitative Challenges (indicate quantitative indicator) Decrease 20% of the peak load at LV point in one year Increase 10% of the Energy Saving at LCH BS02 Qualitative  Business Case – A politically unstable situation Decrease 10% on energy price for LH Our intention is to insert a quanlitative example of what INERTA can do respect to current status

3 BS Status Proposed Business Scenarios BS03 BS04
Qualitative  Business Case – A transmission congestion situation Quantitative Challenges (indicate quantitative indicator) To be defined BS04 Qualitative  Business Case – – A severe windily day Decrease on fees due to unbalancement 2% per day Develop of car electric vehicle 1% per year Our intention is to insert a quanlitative example of what INERTA can do respect to current status

4 BS Status Quantitative Evaluation Partner’s Contributions
Challenges (indicate quantitative indicator) section: Definition [Done] Feedback (using track changes) [Pending] Partner’s Contributions The BSs may need to be extended or further detailed (Please Use track changes) Expected contributions (mainly ETC, PPC) Our intention is to insert a quantitative example of what INERTA can do

5 Use Cases Status Quantitative Evaluation
Quantitative section Challenges (indicate quantitative indicator) section: Definition [Working in progress] Feedback (using track changes) [Pending]

6 UC Partner’s Contributions
Reviced Use Cases UC-01 (CERTH) [Pending] UC-02 (CERTH) [Pending] UC-03 (CERTH) [Pending] UC-04 (CERTH) [Pending] UC-05 (CERTH) [Pending] UC-06 (CERTH) [Pending] UC-07 (ETC_EL) [Pending] UC-08 (HYPERTECH) [Done] UC-09 (PPC/TECNALIA) [Done] by HYPERTECH UC-10 (ETC_EL/TECNALIA/HYPERTECH) [Pending] UC-11 (PPC) [Pending] UC-12 (PPC) [Pending]

7 Deliverable Plan Feedback from all partners by 10th September
Circulate D1.2 preliminary version by 17th September Gather last feedback by 24th September D1.2 ready for peer review 30th September


Download ppt "WP1 - INERTIA Framework Requirements, Specifications and Architecture"

Similar presentations


Ads by Google