1
S. V. Vasiliev, A. S. Kasaev, D. E. Berkaev, V. V. Balakin
XII International scientific workshop on problems of charged particle accelerators in memory of professor V. P. Sarantsev Alushta, 3-8 September 2017 Development kicker feeding high voltage squared pulses generator based on SOS-diodes for Injection Complex VEPP-5 S. V. Vasiliev, A. S. Kasaev, D. E. Berkaev, V. V. Balakin Budker Institute of Nuclear Physics Russian Federation, , Novosibirsk, Lavrentev ave. 11
2
Injection Complex (IC) VEPP-5
2 \ 12
3
Injection\Extraction system of the IC VEPP-5
3 \ 12
4
Kickers of the IC VEPP-5 Plate length: 110 cm
Wave resistance of each plate: Ohm Working aperture: horizontal cm; vertical cm Kick direction: radial Plate feeding scheme: paraphase Field nonuniformity in working aperture ≤ ± 10 % Kick rise/fall time ≤ 80 ns Kick instability ≤ ± 1 % Injection frequency 50 Hz Extraction frequency < 2 Hz Voltage on the kicker plates: ± 43 kV 4 \ 12
5
Scheme of the power pulse kicker’s supply
Energy storage - 2 double pulse forming network Switches - tyratrones TGI1-2500\50 Quasi-traveling wave mode 5 \ 12
6
Main disadvantages Tyratrones: Difficult to access Expensiveness
Short life time Time rise and time fall of the pulses reach the turns period of the beam in the ring, which is 92 ns 6 \ 12
7
Modernization’s direction of the Injection\Extraction system of the IC VEPP-5
The realization of a full-turnover extraction’s mode of a storaged beam Liquidation of the generator’s scheme disadvantages 7 \ 12
8
Operational principle of a SOS-diode
tp = 50 ns Jmax = 10 kA\sm2 Umax = 1 MV 8 \ 12
9
Kicker feeding high voltage squared pulses generator based on SOS-diodes
9 \ 12
10
Results of the simulation
t+ = 388 ns t- = 135 ns Icmax = -4 kA Uload_max = 50 kV tp = 89.4 ns 10 \ 12
11
High-voltage generator for inflectors of the Nestor
t+ = 480 ns t- = 200 ns Uload_max = kV tp = 50 ns t1-9 = 20 ns Tyratrones – TPI1-1k35 11 \ 12
12
Summary In the process of this work was carried out:
simulation generator of high-voltage squared pulses of nanosecond duration, based on the use of a transmission lines as an intermediate inductive energy storage and an SOS-diode as a current breaker; development kicker feeding high voltage squared pulses generator based on SOS-diodes for Injection Complex VEPP-5; the assembly of the generator was started 12 \ 12
13
Thank you for your attention!