Presentation is loading. Please wait.

Presentation is loading. Please wait.

PVB-4A ½”- 2”.

Similar presentations


Presentation on theme: "PVB-4A ½”- 2”."— Presentation transcript:

1 PVB-4A ½”- 2”

2 Modification Overview
Production of the PVB4A series began in 2008 and is current.

3 Canopy Removal The canopy is secured by two screws.

4 Bonnet Removal The bonnet is threaded into the body and sealed by an o-ring. Unscrew the bonnet counter clockwise. There is no spring load. Note: If float spring is damaged, the bonnet must be replaced.

5 Float Removal and Service
The float is free once the bonnet has been removed. Replace the rubber seal by pulling it from the groove on the float.

6 Check Valve Disassembly
The check valve is secured by the float cage and sealed by an o-ring. Remove the float cage. Push down and turn the spring retainer 90 degrees.

7 Check Disc Replacement
The check poppet is free once the spring and retainer are removed. The check disc is free once the retaining screw and guide are removed.

8 Check Seat Replacement
The check seat is pushed into the body and o-ring sealed. Simply pull the seat straight out of the body.

9 Reassembly Notes Reassemble in reverse order. Lubricate bonnet o-ring.


Download ppt "PVB-4A ½”- 2”."

Similar presentations


Ads by Google