Why Post Process? Models are based on many assumptions.
We are dealing with the future. There is no crystal ball. No model is perfect. We can assume that if the model is wrong now, it will not magically improve itself in the future.
3
Base Model We always start off by building a base year model.
This model is used to test our assumptions and compare the model output to empirical data. (i.e. Traffic Counts) There will always be some amount of error.
4
Forecast Model Since we know there are areas in our base model with error…. We need to account for that error in the forecast model. This is referred to as “Post Processing”
5
Guarantees Of Omitting Post Processing
Some day, it will predict less traffic than current levels It will recommend too much construction; implications on: Funding Environmental Design feasibility/ROW constraints It will Undermine credibility of entire process – Most likely in public
6
Both Require Judgement
2 Refinement Methods Link-based refinement Screenline/Cutline-based refinement Both Require Judgement
7
Link-based Refinements
8
Link-Based Refinement
Adjust future assignment based on: Absolute difference in base (Count - Assignment) Ratio difference in base (Count/Assignment) Apply both to future; Then Average Assumes relative is ±15% >15%; Use only the absolute (Dampens Extremes)
9
Example: Link-Base Refinement
Count – 11,000 VPD Assign - 10,000 VPD To bring assignment in line, increase assignment by 10% (Ratio difference) Or, add 1000 VPD (Absolute Difference) If Future Assignment = 15,000 VPD Adjustment: Ratio = (15,000/10,000)*11,500 = (11,000/10,000)*15,000 = 16,500 VPD Absolute = (11,000-10,000)+15,000 = 16,000 VPD Average = 16,250 VPD
10
Example: Link-Base Refinement
Count –2,000 VPD Assign - 4,000 VPD To bring assignment in line, decrease assignment by 50% (Ratio difference) Or, subtract 2000 VPD (Absolute Difference) If Future Assignment = 15,000 VPD Adjustment: Ratio = (2000/4000)*15,000 = (15,000/4000)*2000 = 7,500 VPD Absolute = 13,000 VPD … use this one … why?
11
Base Year Yellow shows where model volumes are greater than counts
12
Base Year Red shows where counts are greater than model volumes
13
Horizon or Future Year 2030 Unadjusted Model Volumes
14
Horizon or Future Year 2030 Adjusted Model (ratio adjustment)
15
Horizon or Future Year 2030 Adjusted Model (additive adjustment)
16
Screenline/Cutline-based
Refinements (NCHRP 255)
17
Screenline/Cutline Refinement
Similar to link adjustment; Considers capacity (remember, your roads must be able to handle the traffic you adjust to) Question: what happens to “equilibrium” when we post process? Considers multiple links in one analysis Attempt to smooth highs/lows over parallel routes in the corridor (alt. to Dial’s method?)
18
Screenline/Cutline Refinement
Screen/Cutline
19
Screenline/Cutline Adjustment Concept
Influencing factors: Base year traffic patterns Change in traffic (base to future) Change in network (e.g., adding a new route) Congestion Influence of capacity/base count (See next page)
20
Capacity and Base Count Adjustments
1.00 0.00 0.90 0.10 0.80 0.20 0.70 0.30 0.60 0.40 Count Adjustment Factor 0.50 Capacity Adjustment Factor 0.50 0.40 0.60 0.30 0.70 0.20 0.80 0.10 0.90 0.00 1.00 0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0 1.1 1.2 1.3 1.4 1.5 Future Year Screenline V/C Ratio
21
* Notes: FCAP and FCOUNT from chart in this example, the refined future assignment RA(f) is averaged, despite the ratio being > 15%
22
Summary/Opinions
23
Link-based Refinement
Advantages Disadvantages Simple application Reasonably defensible Can be applied on a regional scale May not balance out system highs/lows Only moderately responsive to congestion (Adjustments not really capacity restrained) Adjustment difficult without base data (new facilities/limited counts) In areas of high growth, adjustments based on base year calibration may not make much sense
24
Screen line/Cutline Refinement
Advantages Disadvantages For at least study area - balance highs/lows - More dynamic Reasonably defensible Spreadsheet/GIS applications make more practical What is application area? Constantly changing-Must re-evaluate Adjustment less defensible without base data (new facilities/ limited counts) Not reasonable for regional analysis – Without GIS application