Laminated Tube Making Machine for 90 tubes/min

Similar presentations


Presentation on theme: "Laminated Tube Making Machine for 90 tubes/min"— Presentation transcript:

1 Laminated Tube Making Machine for 90 tubes/min
TMM8005 (KOMBIS) Laminated Tube Making Machine for 90 tubes/min

2 Mechatronica Plant

3 TMM8005 for laminated tubes
Technical data : Tube diameter: 16 – 50 mm Tube length: 80 – 200 mm Tube material: ABL / PBL Production speed: ABL up to 90 tubes/min PBL up to 80 tubes/min For cylindrical or elliptical tubes

4 TMM8005: Operations overview
0. Side seaming (body welding) / cutting 1. Shoulder (head) loading 2. Free 3. Sleeve loading 4. Final sleeve loading (positioning) 5. Shoulder welding (hot air) 6. Shoulder welding (high-frequency) 7. Free 8. Membrane sealing 9. Screw-on cap or press-on cap 10. Cap tightening 11. Unloading 12. Idle 12 11 1 10 2 9 3 8 4 7 5 6

5 TMM8005 Laminate in-feed Foil/Roll data: Roll diameter max.: 600 mm
Foil width max.: 160 mm Foil width min.: 50 mm Roll core diameter: 75 mm (3”) or 150mm (6”) Foil types* : ABL (Aluminum Barrier Laminate) PBL (Plastic Barrier Laminate) Foil thickness: ABL > 0.2 – 0.35 mm (Al barrier mm) PBL > 0.2 – 0.5 mm * PE based foil

6 TMM8005 Laminate change Roll exchange time
With manual splicing : 3 – 4 min.

7 Position 0: Side seaming
Technology for PBL-foil : Hot air welding Linear welding speed: 20 m/min

8 Position 0: Side seaming
Technology for ABL-foil : High-frequency welding (Induction) Or Kombiseam: Hot air + high-frequency welding Linear welding speed: 20 m/min

9 Position 0: Sleeve cutting
Rotary knife cutting device Flying rotary cutter for up to 100 tubes/min

10 Position 1: Shoulder (head) loading
Shoulder loading on mandrels with positioning (+/- 2.5 °) Shoulders are held by vacuum

11 Position 3+4: Sleeve loading &
Position 3: The oriented sleeves (body) are pushed over the shoulder on the mandrels Position 4: The sleeves are accurately positioned relative to the shoulder

12 Position 5: Shoulder welding hot air
1. Heating of the welding area by hot air 2. Welding of the sleeve to the shoulder and immediate cooling Welding technology for PBL, everything in one process step

13 Position 6: Shoulder welding high-frequency
1. Press on of the sleeve to the shoulder 2. Welding of the area by high frequency 3. Cooling Welding technology for ABL, a combination hot air / high-frequency

14 Position 8: Membrane sealing
Membrane punching and sealing of the aluminum based foil in one step with high- frequency

15 Position 9: Screw-on cap or press-on cap
Cap screw-on station exchangeable with a Cap press-on station for oriented caps (accuracy +/- 2.5°)

16 Position 10: Tightening station
The cap tightening station applies the proper torque

17 Position 11: Tube unloading
Tube unloading through conveyor belt Direct connection to a packaging machine is possible

18 Change-over Easy change-over of the complete machine in 60-90 minutes
Easy exchange of the mandrels Easy exchange of the welding device Easy exchange of the capping section Quick change of the shoulder & cap feeding devices

19 TMM-8005 is the right choice !
Excellent value, unique price/performance ratio Low-cost size parts Simple concept -> easy to understand and to handle Allows for cylindrical and elliptical tubes Over 50 years experience in machine manufacturing Installed base of 140+ machines worldwide Current customers include: Unilever, Colgate-Palmolive, etc.