“Urban integration of informal settlements”
Sukth Municipality. Albania Pilot Candidate
2
General description Geographical position ; Former state farm
-Appendix to Tirana - Durres highway, -This area nearly 70% of national industrial production -Almost ½ of the Albania population live here Former state farm -With 5902 families growing fruit ,vegetables ,wheat etc. -In 20 years time the population doubled, now people -Total area 5069 ha. Land for construction 50,4 ha
3
Construction structure
What level construction. -Self declared ,1467 informal constructions -Nearly 40% of the families are of very low income , 35% of medium level and 25% of relatively higher. Place of origin of the people: -Nearly 65% from northern part of Albania Dibra Tropoja Kukesi ,Mati etc. Natives nearly 20%, others 15% Land conflicts. -Former owners and those favoured by law -The process of registration undergoing
4
Reasons why informal People forced to move from poor remote places
The government could not respond to the housing demands. The government failed to enforce law and order to stop the phenomena. The government could not offer construction permision according to certain plans People in a hurry to occupy a piece of land as considered without any private owner.
5
Prone to hazards Flooding Poorly constructed houses
-A river (Erzeni) running close by; -Drainage system is out of function Poorly constructed houses -Built without construction design project -Easily demolished ( earthquakes)
6
Municipality structure
There is an organizational structure of ten offices.Some of the main offices: -Territory managment office -Finance office, budget 1.5 mil. Euro/per year -Tax office; small income ; property tax very low -Informal settlement office -Legal office Staff ,42 with very little training. Offices poorly equipped
7
Infrastructure Almost without a seweage sistem; only a part of it works normally Main water supply pipe passing through, lack of secondary lines to the houses. An asphalted road runs through , no pavement at all;muddy secondary streets Chaos with the power supply; the secondary network broken. Chaos in telephone lines.
8
Bussiness Big bussiness
-20 entrepreneurs, mainly agriculture production Leather processing, shoe factory Small bussiness -Trade and service shops, total 233 Main saurce of income -Most of the families engaged on agriculture production
9
Construction permission Problems
Land Ownership -Two or more owners for the same piece of land Land destination change -Construction predominant on agriculture land Insufficient planning capacity -Staff not with the right qualification -Lack of financial means -Absence of the necessary equipment
10
Education and Health service
Two Middle schools -Many students in a class Three nine- year schools -One and the same road (without sidewalk)for people cars, trucks, buses etc Three kindergardens -Poorly furnished Five nursery centers -Hospitals in Durres or Tirana
11
Leisure time No sports activities. No playgrounds.
Only school activities Watching Tv programs,. Evenings, in bars and playing billiards
12
Some figures of low income
220 persons classified work invalids 227 families paid by legal medical commisions 50 persons vulnerable 40 persons total blind 58 persons live on municipal social assistance
13
ALUIZNI An office established Two specialists employed
Files are being processed No informatization Willing to collaborate
14
Items to improve Legal framework Institutional collaboration
Local regional and central relationship Staff qualification Community awareness and responsibility Proper urban plans
15
Closing words Mayor’s words of wellcome:
“Come to Sukth and enjoy our hospitability. We need a “pilot” to take off our plane and land it to “GTZ airport”.Give us that chance. Thank you”