Download presentation
Presentation is loading. Please wait.
Published byFrancis Butler Modified over 6 years ago
1
Gas Regional Initiative South South-East CAM Implementation Group
Update on activity Bucharest, 20th November 2015 TITRE
2
2nd CAM IG meeting – update
Joint methodology for capacity calculation and maximisation - Art. 6 E-Control presented kick-off proposal for discussion on harmonised methodology for calculation of technical capacities at IPs Capacity quotas - Art. 8 Long term contract mismatch – one year restriction for unbundled product Capacity quotas for short-term and up to 5 years – more than 10/10% Qt Competing capacities - Art. 8 (2) IPs between more than 2 TSOs at one junction station (1:n) – auctions Network’s technical congestion vs. competing capacities at IPs – auctions IPs vs internal points (domestic points or storages) – auctions vs FCFS 19th GRI SSE SG meeting, Bucharest 2
3
2nd CAM IG meeting – update
Booking platforms – Art. 27 Usage of Booking Platforms from 1st November 2015 According to the latest CAM NC Roadmap and information passed on the GRI SSE CAM IG meeting: PRISMA is used to auction capacity at the IPs between: Czech Republic and Germany Czech Republic and Slovakia Austria and Slovakia Croatia and Slovenia RBP is used to auction capacity between: Hungary and Romania Hungary and Slovakia GSA is used to auction capacity between: Czech Republic and Poland At the following IPs TSOs have not yet found an agreement on the choice for a single booking platform: Austria and Hungary - tender procedure in preparation Germany and Poland - bilateral discussions ongoing Romania and Bulgaria - ? Greece and Bulgaria - ? Croatia and Hungary - ? 19th GRI SSE SG meeting, Bucharest 3
4
2nd CAM IG meeting – update
Update on compliance progress of booking platforms All platforms declared full CAM NC compliance as of 1 November 2015 Update on Booking Platforms’ cooperation in the GRI SSE region Cooperation between RBP and GSA as of November 2015 FGSZ and GAZ-SYSTEM worked out the business concept and the technical cooperation model to connect RBP and GSA The RBP-GSA communication was tested during the second half of September Cooperation Agreement first draft prepared –in discussion between the Parties The high-level documents of the RBP-GSA bilateral cooperation model have been shared with PRISMA and feedback has been provided 2nd CAM IG meeting of GRI SSE – Bucharest, 19th November 2015 4
5
Thank you for your attention!
19th GRI SSE SG meeting, Bucharest 5
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.