Download presentation
Presentation is loading. Please wait.
Published byCecily Lynch Modified over 6 years ago
1
Task 1.3 Pilot site surveys & audits TECNALIA J. Oyarzabal
2
Task 1.3: Pilot – Tecnalia
3
Task 1.3: Pilot – Tecnalia Distributed Technologies laboratory used for: Own R&D Activities Power electronics control PMUs MicroGrid control Hydrogen Storage technologies Electrical Vehicle communication protocols / charging …
4
Task 1.3: Pilot – Tecnalia Distributed Technologies laboratory used for: Third party equipment test Inverter, power electronics Advanced meters … External R&D Activities Custom Visitors Demonstrators
5
Task 1.3: Pilot – Tecnalia Components: Generation
3x50 kW Pacific power source 2x55 kW diesel gensets with inverter interface 1x50 kVA Turbine 3.6 kW (3), 0.6 kW, 1.6 kW (1) PV modules 6 kW (1) wind mill
6
Task 1.3: Pilot – Tecnalia Storage: Load 250kVA Flywheel
48V 2.8MJ (1) Ultracapacitor bank 48V-1925Ah Battery banks 24V-1120Ah Battery banks Load 150kW, 55kW Resistive load bank 2x36kVA Reactive load bank 1x54kVA Capacitive load bank Several other steps integrated into the connec. boards
7
Task 1.3: Pilot – Tecnalia Test boards
Source (mains, controlled…) connection cubicle Resistive load banks Inductive load banks Capacitive load banks Equipment under test Electrical measure at each cubicle
8
Task 1.3: Pilot – Tecnalia
9
Task 1.3: Pilot – Tecnalia
10
Task 1.3: Pilot – Tecnalia Remote control: Generation Loads
Pacific power source => Programmable Diesel gensets (inverter) Built in low level ModBus over RS-485 Remote high level library (IEC / XML-RPC) Loads (almost all) Built in low level ModBus over Ethernet (Beckhoff module)