Activated sludge settling problem resolved

Similar presentations


Presentation on theme: "Activated sludge settling problem resolved"— Presentation transcript:

1 Activated sludge settling problem resolved
Al Parrella Western Lake Superior Sanitary District

2

3 Typical SVI values 65-70 range (annual average)

4 SVI values December-February (2012-2013)

5 SVI values December-February (2012-2013)
Trouble above this line

6 Problems in plant High sludge blanket levels Thin sludge
Appearance of settleometer Other indicators to follow:

7 Return sludge solids concentration

8 Thickened sludge solids concentration (sludge sent to digestion)

9 Operating parameters, centrifuges
Month/parameter % capture Polymer dosage, lb./ton active % cake solids December 2012 85 56 24 January 2013 98 46 25 February 2013 49 26

10 Operating parameters, centrifuges
Month/parameter % capture Polymer dosage, lb./ton active % cake solids December 2012 85 56 24 January 2013 98 46 25 February 2013 49 26 Problem

11 What started it all? Problem with dewatering centrifuge polymer system
Common to both centrifuges Corrected early January

12 SVI values December-February (2012-2013)
Mechanical problem repaired here

13 SVI values December-February (2012-2013)
Mechanical problem repaired here Activated sludge process adjustment made here

14 Initial response to problem
As plant became upset with recycled digested sludge, response was to increase the aeration units in service This may have been proper to address the amount recycled septic sludge entering the aeration system but caused a classic “low nutrient” problem when the recycle flow stopped

15 My point: Even though mechanical problem was resolved in early January we still had deteriorating activated sludge problem because we had too many aeration units in service!

16 Adjustment made to number of Unox reactors in service

17

18

19

20

21 Result of taking reactor off line
BOD was driven deeper into the basins F/M increased (by roughly 25%) Sludge regained its darker-brown color SVI came within range and settling improved in the nick of time (before the spring floods)

22 Through it all Only effluent limit that we struggled with was phosphorus But we met all limits