Presentation is loading. Please wait.

Presentation is loading. Please wait.

CASE STUDY: B777 IN-SEAT IFE INTEGRATION

Similar presentations


Presentation on theme: "CASE STUDY: B777 IN-SEAT IFE INTEGRATION"— Presentation transcript:

1 CASE STUDY: B777 IN-SEAT IFE INTEGRATION
Omni Air International: Jason Johnson SkyPaxxx: Rick Lockhart Zodiac Inflight Innovations: Jared Siqueland

2 Overview of the Project
Cabin Layout (380 All TC) Sicma 2319 Series TC Seat (SkyPaxxx) Zodiac (formerly IMS) RAVE™ IFE System Upgraded CMS (BAE Systems) Engineering (Omni/DRB Aviation) Certification (DRB Aviation – ODA STC) Aircraft Modification (Kallitta Air)

3 IFE Selection Areas of Focus
Proven/Established Design Innovations vs. Risk Capacity of IFE Supplier Ability of Supplier to Support their Product Financial Stability of IFE Supplier Make a Connection with Previous Customers

4 New vs. Used Seats Cost – Acquisition + OH = New?
Availability of Desired Configuration Risk of Testing/Certification Project Timeframe Established Design

5 Assembling the Integration Team
Understand the Project Scope Develop Team Structure Source the Best Providers Possible

6 Project Management Difficult Project with a Complex Timeline
Multiple Vendor Project Multiple Critical Path Items Across Vendors Establish Clear Lines of Responsibility Consider a Project Statement of Work Address Challenges Immediately by Leveraging the Team

7 The Airlines Investment
The Airlines Investment in a Successful Project Goes Beyond Time and Money. It’s Important to Stay Engaged in Both the Good and the Challenging Times to Ensure The Airlines Vision of Success is Achieved.

8

9 The Integrator Experience
The Roll Of The Integrator ON TIME DELIVERY The end product represents the entire team Support after delivery Teamwork Airline Engineering/Certification/IFE/Integrator Avoiding The Pitfalls Establish a plan and do not skip ahead Effective communication prevents errors Nobody is perfect

10 Zodiac Inflight Innovations RAVE™

11 The IFE Experience IFE approach to managing the project
Seat integration Ensuring responsibilities are defined Pillars of Success Relationship Communication Planning How we behave Execute like a supplier Behave like a team member


Download ppt "CASE STUDY: B777 IN-SEAT IFE INTEGRATION"

Similar presentations


Ads by Google