1 5/24/2017

2 Action Items (5/24 additions)
No. Status Description Due Date POC 17 OPEN Order pressure transducers 18 Order payload avionics 20 Schedule parent meeting 21 Place Action Item file where we can access each week 22 Get main engine ignitor transformer Charles 23 Order new ignitor transformer 24 Purchase more carbon fiber 25 Print 10 copies of procedures used for Mansfield launch 26 Coordinate Mansfield fire dept support for launch

3 Work Party June 3 & 4 Task Summary: Fin sample fabrication (Saturday)
Fin blank fabrication (Sunday) Need to purchase more carbon fabric Machine Yaw probe support Fabricate main engine ignitors Avionics system test - if required Procedure review (Sunday) Servo installation Need to bring the rocket

4 Tasks Today (5/24) CG model review
Integrated ignitor & avionics checkout Mix Fuel (water / alcohol) Cut composite materials for fin samples Generate fin drawing Review parent meeting briefing Probe mounting structure profile Launch team assignments Launch control box checkout Determine how much more carbon fiber we need for fins Open Action Items from last week

5 Fuel Properties

6 P-reg (REG1) Set Point

7 Injector Data

8 P-reg = 300 + 94.56 = 395 psig (VERIFY)
P-reg (REG1) Set Point P-reg = = 395 psig (VERIFY)

9 LOX Injector Water Flow Test Data

10 LOX Injector Water Flow Test Data

11 Fuel Injector Water Flow Test Data

12 Fuel Injector Water Flow Test Data

13 Fuel Trim Valve Set Data – (used 25/75 fuel mix)

14 Fuel Trim Valve Set Data – (used 25/75 fuel mix)

15 Injector Design Data