Presentation is loading. Please wait.

Presentation is loading. Please wait.

Classroom Technology Update Nov – FY16 Presentation to UTFAB

Similar presentations


Presentation on theme: "Classroom Technology Update Nov – FY16 Presentation to UTFAB"— Presentation transcript:

1 Classroom Technology Update Nov. 2015 – FY16 Presentation to UTFAB
Al Powell Director, Learning Technologies Classroom Support & CSU Online

2 Report Agenda UTFAB FY16 – Project updates
Forecast for remaining projects Thanksgiving - Winter Break - Summer UTFAB Proposal for FY17 Questions & Answers

3 Technology Refreshes - Goals
Digital/HDMI inputs and outputs - Better image resolution Projectors – Brighter, lower maintenance, laser when appropriate Audio amplifiers – Lower power consumption Consistency in electronic controls – Remote monitoring and control Document cameras – Increased reliability & image quality Lecture capture ready – Basic infrastructure for future

4 Budget Overview Allocated Funding for FY 15 = $186,400
Funding spent (10/1/15) = $7,759 Remaining Funds (10/1/15) = $178,641

5 Completed Projects Classroom updates – Completed in Summer 2015
* Not UTFAB funded Technology upgrades Eddy Hall Education 7 Clark C-Wing – 213, 217, 250, 251 Health & Educ. Science – new building *Laurel St new building *Plant Research Center – new building *ARDEC: Ag Research Center *UCA Runyan room

6 Remaining FY 16 Projects EDUC 13 Projector EDUC 105B
HDMI switcher/projector/cables ENGR E106 HDMI switcher/cables GIFFORD 146 GLOVER 201 Switcher/projector/Blu-Ray/screen/cables JOHNSON 222 HDMI switcher MIL SCI 105 MIL SCI 115 Switcher/projector/Blu-Ray/cables PATH 109 TILT 221 Switcher/projector Classroom modifications require re-programming Crestron controls.

7 Remaining FY 16 Projects Clark A-Wing – 11 Rooms
Lectern audio/video switcher: HDMI capable Better, ‘adaptable’ image Allows laptop HDMI output to be recorded in lecture capture New digital transmitter-receiver pairs to send image to projectors

8 Remaining FY 16 Projects - Timeline
Thanksgiving Break Projects *Non-UTFAB funded Education 105B – projector Education 13 - projector/HDMI switcher Gifford 146 – projector Military Science 105 – projector Pathology 109 – projector *Aggie Village B111- complete lectern system & install

9 Remaining FY 16 Projects - Timeline
Winter break projects *Non-UTFAB funded Wagar 232 – complete room update; parts received & stored Johnson Hall 222 – HDMI switcher upgrade Engineering E106 – HDMI switcher Military Science 115 – HDMI switcher/Crestron panel/audio *Clark C-wing room remodels *Micro 101- re-install equipment after remodel

10 Remaining FY 16 Projects – Timeline
Summer 2015 projects Clark A-Wing HDMI switcher upgrades & programming Clark 101, 102, 103, 104 Clark 201, 202, 203, 204, 205, 206, 207 TILT 221 – HDMI switcher, upgrade projector

11 Questions about FY 16 Projects?

12 FY 17 Proposed Updates/Upgrades

13 FY 17 Proposed Updates/Upgrades
BEHAVIORAL SCIENCES 103 6,500 Lumen Laser DLP & HDMI switcher / TX-RX $9,500 105 6,500 Lumen Laser DLP / Audio amp $8,700 107 6,500 Lumen Laser DLP / HDMI switcher / Crestron / TX-RX 131 13,000 Lumen – WUXGA $40,000 EDDY 3,500 Lumen WXGA / HDMI switcher / Crestron / TX-RX $4,850 108 3,500 Lumen WXGA & HDMI switcher – Crestron / TX-RX 212 6,500 Lumen Laser DLP & HDMI switcher ENGINEERING 100 8,500 Lumen WUXGA $18,000 B101 Complete smart room remodel $20,000 JOHNSON HALL 222 10.6K Lumen WUXGA $35,000 PLANT SCIENCE C101 CSS labor – 500 hours Installation / programming / system integration $37,500 TOTAL FY 17 PROPOSAL $215,400

14 Questions about FY 17 Proposal?


Download ppt "Classroom Technology Update Nov – FY16 Presentation to UTFAB"

Similar presentations


Ads by Google