Download presentation
Presentation is loading. Please wait.
1
Cluster Active Archive
System Infrastructure ESTEC 31st May – 1st June 2005 CAA review
2
Design considerations
Operating system Hardware scalability Software compatibility 3rd party products like IDL, rdbms etc. software already written for instrument data. effort in porting/reimplementation. Cost CAA review
3
CAA review
4
CAA review
5
Server hardware considerations
License costs Processor type Memory – how big, single/dual channel Local storage – ide,sata1,u160,u320 Onboard or add-on h/w for local IO Networking h/w add-on requirements Room for further expansion on motherboard CAA review
6
Final server configuration
Component Description Processors Intel XEON 3.0GHz * 2 SCSI Onboard dual channel Ultra320 scsi, Intel i960rs Ultra160 pci scsi controller Local storage 2* 36GB Ultra320 raid1 Video ATI rage XL 8MB PCI Peripheral slots 64bit 100MHz * 2, 64bit 66MHz * 4 USB 2 Network interface Onboard gigabit Ethernet * 2, Intel PRO/1000mt gigabit dual port adapter CD/DVD NEC ND-2500 Power Internal redundant 400 watt CAA review
7
Server components CAA review
8
Network Interfaces CAA review
9
Storage considerations
Cost IO performance Capacity and growth Server load CAA review
10
Storage options direct attached (DAS) network attached (NAS)
advantages: lowest cost, easiest to implement and support disadvantages: difficult to expand, difficult sharing and failover network attached (NAS) advantages: can be shared by different operating systems disadvantages: slower than SAN (more software intensive), limited by ethernet bandwidth storage area network (SAN) Advantages: speed, expandability, separate FC based connectivity Disadvantages: cost CAA review
11
CAA review
12
SAN options CAA review
13
Backup Expansion – any hardware solution must have the ability to increase it’s capacity along with the storage without requiring replacement. Transfer rates – this has to be sufficiently high to recover large amounts of data within a reasonable time Strategy - none Disaster recovery plan – in progress but not yet finalized CAA review
14
Connectivity CAA review
15
CAA review
16
CAA review
17
CAA review
18
CAA review
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.