Presented by Mr Fundisile Mketeni: CEO SANParks
2015/16 Annual Report and Financials Presented by Mr Fundisile Mketeni: CEO SANParks
2
Presentation Content Vision and Mission Scope of SANParks
2015/16 SANParks Strategy Map 2015/16 at a glance – major highlights for the year Performance Dashboard 2015/16 Financial Performance Update on audit matters
3
A Sustainable National Park System Connecting Society
SANParks Vision and Mission Vision A Sustainable National Park System Connecting Society Mission To develop, expand, manage and promote a system of sustainable national parks that represents biodiversity and heritage assets, through innovation and best practice for the just and equitable benefit of current and future generations
4
Scope of National Parks
Background Information South Africa has 509 state owned terrestrial and 25 marine protected areas, and are managed by 13 different states authorities. Collectively, terrestrial protected areas exceed 8.9 million ha (7.4% of the country), while the marine protected areas comprise over 18,5 million ha; Nearly 4 million ha (3.2% of SA surface and 67% of state owned terrestrial protected areas) are under SANParks management. Northern Cluster Arid Cluster Frontier Cluster Cape Cluster G.Route Cluster
5
2015/16 Strategy Map Although this the Strategy as it was tabled by the Honourable Minister Edna Molewa on the 11 March 2015, please note that the Strategy is currently under review so that is closely aligned to: Government's Radical Socio-Economic Transformation agenda; and DEA's transitioning Tia Green and inclusive Economic imperatives; and Government Responsible Tourism Strategy
6
2015/16 year at a glance – Major Highlights
7
2015/16 – Major Highlights..cont
R1.497 billion Tourism Revenue 5.9 million visitors to National parks 9.5%- increase in black visitors 52 547 People accessed NPs for free 980 - SMMEs supported (R213 million spent on SMMEs) 73% - average unit occupancy
8
Highlights cont….Jobs in NPs
CATEGORY NUMBER OF JOBS Permanent SANParks Contract and Temps EPWP (FTE’s) PPP’s 4 062 989 6 215 1 943 TOTAL 13 209 Over people get up and go to work in a national park everyday.
9
EPWP Social Impact: Women & Youth
Percentage women 55% Percentage youth 70%
10
Performance against targets
2015/16 Performance against targets
11
Legend Target achieved or exceeded - Good Performance Work in Progress
Target not achieved
12
SO 1: Optimised Economic Contribution Through Tourism and Associated Activities
Performance indicators Baseline ( Performance) Annual Target Annual Performance Challenges / Corrective measures Budget Variance (Income) 1:1 01:01 1.11:1 The income to cost ratio was 1.11:1 which means that SANParks’ income was 11% better than the cost i.e. the organisation has enough income to cover its costs. Gross / Operating Tourism Revenue (YoY) 10.5% 11% 14,7 % None Total Number of Revenue Generating Products Implemented 8 7
13
0% (Draft strategy developed)
SO 1: Optimised Economic Contribution Through Tourism and Associated Activities Performance indicators Baseline Annual Performance Annual Target Annual Performance Challenges / Corrective measures Fundraising Policy & Strategy Developed and Implemented New Indicator 100% 0% (Draft strategy developed) The strategy and policy will be finalised and implemented in the 2016/17 financial year. Accommodation Occupancy 72.1% 72.5% 73% None Customer Satisfaction Index 82% 82.1% Total Number of Visitors to National Parks
14
SO 2: Enhanced Conservation and Ecological Integrity of National Parks System
Performance indicators Baseline Annual Performance Annual Target Annual Performance Challenges / Corrective measures METT Score 60.0% 70.0% 71% None Total hectors of land rehabilitated / restored (Initial) (ha) 50 836 33 368 ha Total hectors of land rehabilitated / restored (Follow-up) (ha) (ha) ha,694 ha Total hectors of land rehabilitated / restored (Wetlands) (m³) 2 603 m³ 6 508 m³ m³ Total Area Added to National Parks (Terrestrial) (ha) 6 125 ha 3715 (ha) ha
15
SO 2: Enhanced Conservation and Ecological Integrity of National Parks System
Performance indicators Baseline Annual Performance Annual Target Annual performance Challenges / Corrective measures Total Area Added to National Parks (Marine) (km2) 0 ha 0 ha No marine protected area was added to the National Park system in 2015/16 and there was no target set during the year. Targets are only set for the outer years of the MTEF Total Number of Park Management Plans Reviewed and Submitted 2 None Total Number of Species Protection Interventions Implemented New Indicator 6
16
SO 2: Enhanced Conservation and Ecological Integrity of National Parks System
Performance indicators Baseline Annual Performance Annual Target Annual performance Challenges / Corrective measures Total Number of Cultural Heritage Interventions Implemented 4 5 None % of research projects relevant to SANParks key issues 78% 73.0% 76,3% Total Number of Peer Reviewed Research Publications 15 20 53
17
SO 3:Optimised Socio-economic Beneficiation
Performance indicators Baseline Annual Performance Annual Target Annual performance Challenges / Corrective measures Total Number of Free Access Entrants 53 251 18 200 52 547 None Total Number of Environmental Education Impact Assessment Tools Developed. 2 Total Number of Participants in Environmental Education Programme Total Number of Full-time Equivalent Jobs Created (EPWP) 4 691 EPWP = 7942 EPWP (FTE) : 6 364 Challenges: Delays in approval of business plans Funding constraints
18
SO 3:Optimised Socio-economic Beneficiation
Performance indicators Baseline Annual Performance Annual Target Annual performance Challenges / Corrective measures Total Number of Full-time Equivalent Jobs Created (Other) 150 196 144 Challenges: The Groen Sebenza programme ended in December 2015 and the interns got permanent employment hence the target of 196 was not achieved. Corrective measures: None: Full time employment encouraged. Total Number of temporary Jobs Created through Socio-economic initiatives 40 50 79 None
19
SO 3:Optimised Socio-economic Beneficiation
Performance indicators Baseline Annual Performance Annual Target Annual performance Challenges / Corrective measures Total Number of SMMEs/Enterprises Supported 701 501 980 None Number Community Contractual Agreements in Place 1 5 3 The planned targets could not be achieved due to complexities in finalisation of community agreements. SANParks will continue to engage with different stakeholders to reach consensus and finalise the outstanding agreements in 2016/17.
20
SO 4: Enhanced Stakeholder Engagement
Performance indicators Baseline Annual Performance Annual Target Annual performance Challenges / Corrective measures Total Number of Proactive Media Engagements (Articles) 15 25 42 None Total Number of Proactive Media Engagements (Media Events) 9 10 21 Media Reputation Rating 95 >95% 99%
21
SO 5: Effective and Efficient Corporate Governance
Performance indicators Baseline Annual Performance Annual Target Annual performance Challenges / Corrective measures Auditor General Audit Report Unqualified with no other methods Unqualified with no matters of emphasis None % progress against Risk Response Plan New 90% milestones on the progress against implementation of the risk response plan 90 % corporate risk matric reassessed. Risk Management Framework was reviewed and submitted to ARC. Implementation of risk mitigation initiatives % Compliance with Governance Requirements 80.0% 80% 100% Total Number of ICT Strategy Initiatives Implemented per Schedule 1
22
SO 6: Strengthened Human Capital and Management
Performance indicators Baseline Annual Performance Annual Target Annual performance Challenges / Corrective measures Black as % of Management 55% 57% 56,6% Challenges: Resignation of black managers Corrective measures: Recruitment policy has been amended EE and succession plan to be reviewed Women as % of Management 35% 50% 36,1% Original target met and exceeded; target increased upwards to be aligned with National Targets; Insufficient vacancies to meet target Corrective measures: Recruitment policy and procedure amended; Women Forum launch – making SANParks attractive to professional woman
23
SO 6: Strengthened Human Capital and Management
Performance indicators Baseline Annual Performance Annual Target Annual performance Challenges / Corrective measures People with Disabilities 1.2 2% 1.3% Challenges: Nature of work limit categories of disabilities Universal access standards in work place not yet achieved Corrective measures: Continue with the declaration drive Identify and ring-fence posts Engage organised structures Total Male: Female Ratio 1.8:1 1.8.1 1.78.1 None % of Employees Meeting Minimum Educational Requirements (C and Upper) 94% 67.0% SANParks is currently verifying all employee qualification from C Band and up. Various programmes such as RPL and employee bursaries are also being implemented to close the gaps.
24
SO 6: Strengthened Human Capital and Management
Performance indicators Baseline Annual Performance Annual Target Annual performance Challenges / Corrective measures % of Performance Appraisals Completed (C and Upper) 80% 100% 98% Challenges: Delay in roll out of new performance system to include CMCs, Manual reporting systems Corrective measures: Performance Management Training is conducted to ensure implementation. % Success Rate at CCMA 85 % 96,5 % None % progress against implementation of Skills Development Programme 85% 88%
25
Interventions relating to Rhino Poaching
Number of Rhinos poached stabilised in 2015 (826 Rhinos poached in 2015 compared to 827 in 2014), however poaching attempts increased significantly in 2015/16 317 suspected poachers were arrested in and around Kruger National Park 188 firearms seized in and around the KNP (148 in the previous year) 150 rangers recruited in the KNP in past 4 years Going forward Continued joint law enforcement operations in and around the Kruger park. Close corporation with neighbouring countries such as Mozambique Use of modern technologies Active involvement of neighbouring communities Engage government for additional funding
26
Financial or Trading Position
27
Statement of Financial Performance
28
Statement of Financial Position
29
Statement of Financial Position
30
Statement of Financial Position
31
Audit Summary 2015/16
32
2015/16 Audit matters SANParks received an unqualified audit opinion in the 2015/16 financial year with no matters of emphasis. No material findings were made on the usefulness and reliability of reported performance information. Below is a summary of AGSA conclusions on usefulness and reliability of reported performance information: Strategic objective Usefulness Reliability Objective 1: Optimised economic contribution through tourism and associated activities Unqualified Objective 2: Enhanced conservation and ecological integrity of National Parks system Objective 3: Optimised socio-economic beneficiation
33
Performance summary 2015/16
34
Thank You