2015 FAHP Annual Meeting For Oregon’s Programmatic Endangered Species Act Consultation on the Federal-Aid Highway Program March 15, 2016
2
FAHP Annual Report Background Purpose Highlights
3
Training Quarterly Updates at Team Meetings User’s Guide
Biology & Wetland Team Region Environmental Coordinators User’s Guide New version rolled out in February 2016 ODOT Qualification Program for ESA Compliance Held February 2016 Included Hot Topics
4
Types of Projects covered by the FAHP since implementation (December 2012)
5
Submittal & Approval Data
Number of Projects Submitting Notification in Calendar Year: 2013 (42) 2014 (43) 2015 (26) Number of Projects per Type of Notification: NMFS Approval Required 17 26 13 Notification Only (FHWA-only Approval) 25 Avg. # Days for FHWA Approval: 10 5 6 Avg. # Days for NMFS Approval: 54 40 19 Projects with IWWE or other significant changes(some projects had multiple changes over different calendar years) 2 15 Projects submitted with insufficient data or supplemental materials are sent back and the timelines above reflect approval time for a complete submittal only.
6
2015 Statistics 33 new projects started FAHP ESA process
26 Projects submitted notifications for approval No new projects required separate formal consultation with NMFS in 2015
7
Annual Take Metrics & Recovery Domains
Take is allocated based on first year of construction Fish Salvages are the exception, assigned yearly Majority of projects have less than 1 year of construction Take quantities are estimated until submittal of construction completion report The changes captured in the CCR are downward adjustments in take primarily
8
Interior Columbia Recovery Domain
Canyon Creek Complex Fires (Sheep & Vance Creeks) Ladd Creek
9
Interior Columbia Recovery Domain
Maximum Annual Allocation Actual Running Total (2013) Actual Running Total (2014) Anticipated Running Total (2015) Anticipated Running Total (2016) Anticipated Running Total For Program Anticipated Number of Projects 2 5 1 8 Fish Salvaged (#) 580 799 N/A Riparian Habitat Disturbed (ac) 29 .002 0.473 .005 .48 Trees (>18") Removed from Riparian Zone 429 Streambank Hardening below OHW (linear ft) 2462 Net New Impervious (ac) 53 2.38 -.08* .008 2.308 Steel Pile Driven Below OHW 380 6 14 *Current projections show more impervious area being removed than being created in 2015.
10
Willamette / Lower Columbia Recovery Domain
Westport Ferry
11
Willamette / Lower Columbia Recovery Domain
Maximum Annual Allocation Actual Running Total (2013) Actual Running Total (2014) Anticipated Running Total (2015) Anticipated Running Total (2016) Anticipated Running Total For Program Anticipated Number of Projects 2 16 17 29 64 Fish Salvaged (#) 1300 25 NA Riparian Habitat Disturbed (ac) 66 0.13 0.255 .611 .736 1.732 Trees (>18") Removed from Riparian Zone 957 5 8 12 27 Streambank Hardening below OHW (linear ft) 5493 375 241 100 125 841 Net New Impervious (ac) 117 0.63 8.181 5.448 9.12 23.379 Steel Pile Driven Below OHW 900 202 106 372
12
Oregon Coast Coho Recovery Domain
Neahkahnie Creek Culvert Replacement
13
Oregon Coast Coho Recovery Domain
Maximum Annual Allocation Actual Running Total (2013) Actual Running Total (2014) Anticipated Running Total (2015) Anticipated Running Total (2016) Anticipated Running Total For Program Anticipated Number of Projects 1 9 7 19 36 Fish Salvaged (#) 720 33 40 NA 73 Riparian Habitat Disturbed (ac) 0.16 .206 2.093 2.459 Trees (>18") Removed from Riparian Zone 528 3 28 31 Streambank Hardening below OHW (linear ft) 3030 238 373 611 Net New Impervious (ac) 65 3.82 0.98 4.296 9.096 Steel Pile Driven Below OHW 500 150 18 186 504
14
Southern Oregon / Northern California Coho Recovery Domain
Deer Creek Bridge Replacement
15
Southern Oregon / Northern California Coho Recovery Domain
Southern Oregon / Northern California Coast Recovery Domain Maximum Annual Allocation Actual Running Total (2013) Actual Running Total (2014) Anticipated Running Total (2015) Anticipated Running Total (2016) Anticipated Running Total For Program Anticipated Number of Projects 2 4 5 11 Fish Salvaged (#) 400 20 NA Riparian Habitat Disturbed (ac) 0.346 .106 .452 Trees (>18") Removed from Riparian Zone 198 14 18 Streambank Hardening below OHW (linear ft) 1705 670 100 770 Net New Impervious (ac) 36 1.27 6.32 .672 8.262 Steel Pile Driven Below OHW 220
16
2015 Construction Monitoring
49 Projects in construction 100% compliance with basic monitoring requirement (1 per year, per project) 85 Official construction monitoring reports submitted 10 covered multiple inspection dates Several stand alone photo only inspections Numerous other visits without official report. Plan to increase quantity and quality of reports in 2016
17
2015 Construction Monitoring Results
Most common issues encountered Erosion control fencing maintenance Improper fuel storage, often empty cans Ineffective storm drain and bridge scupper blocking Most issues were able to be corrected immediately upon notice Plans to increase emphasis on these areas in upcoming construction inspector training classes
18
Ladd Creek Fish Passage Project
Ladd Creek, a tributary of Catherine Creek, contains SRB steelhead, listed as threatened under the state and federal ESA. Chinook salmon historically spawned in Ladd Creek. Construction of I-84 through Ladd Canyon in the 1970’s resulted in complete blockage of fish passage for all species at all flows as a result of a 20-foot vertical culvert miles of spawning habitat was blocked. Two additional concrete box culverts lower in the canyon were partial passage barriers
19
Ladd Creek Fish Passage Project
20
Ladd Creek Fish Salvage & Follow Up
August 17, 2015 90% mortality rate on 247 fish captured Unusual & isolated incident Likely due to bucket overcrowding Notification occurred to Bill Lind (NOAA Lower Snake River Branch Chief) & Eric Morgan (NOAA Office of Law Enforcement) Three additional salvages resulted in 509 steelhead salvaged with only 1 mortality
21
Ladd Creek Fish Passage Project
Action items in response to Ladd Creek Mortality: Action Item Date Completed or Planned: NOAA Electrofishing Guidelines training at: - Statewide ODOT Regional Environmental Coordinator (REC) meeting - Statewide ODOT Biology Team meeting FAHP Training 9/24/2015 10/15/2015 2/4/2016 Smith-Root Electrofishing and Fish Handling Training at Smith-Root. (Will be required every 5 years for crew leaders) 5/3-4/2016 Annual training at statewide Biology Team and REC Team meetings Annually Update the 2016 FAHP Guidance Document to include more detail on electrofishing, fish handling, and communication protocols. The document now includes the NOAA Electrofishing Guidance as an appendix instead of just a reference. Spring 2016 Mandatory use of aeration buckets for fish holding on all fish salvages. Fall 2015
22
Ladd Creek Fish Passage Project
Construction is nearly complete, opening up over 12 miles of habitat!
23
Advanced Opportunistic Stormwater Credit & Alternative Stormwater Approach
24
Environmental Enhancements
Stormwater treatment 63.45 new acres treated Only new acres of impervious surface area Vance & Sheep Creek Culverts New oversized culverts installed due to Canyon Creek Complex fire Large woody debris Improved fish access on Vance Creek Large wood and fish rocks implemented on many projects around the state