Download presentation
Presentation is loading. Please wait.
Published byJeffrey Griffin Modified over 6 years ago
1
Evaluation of different design options within the procurement process of the Czech public sector based on the overall economic benefits Jiří DOBIÁŠ, Daniel MACEK Faculty of Civil Engineering, Czech Technical University in Prague,
2
Objectives AIM To question the traditional public procurement system.
Assess a building design and account for: capital expenditures operational expenditures time value of money Life Cycle Cost Inspector Sight examination. PUBLIC SECTOR PROCUREMENT (a) the lowest bid price (b) the overall economic impact (c) combination
3
Methods Overall cost break down & cash flow projections
Component analysis – FCU system vs. Induction unit Time impact
4
Results Component analysis
Savings in the capital investment =? more effective investment
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.