Computing WG highlights
September 8th 2011 P. Valente
2
Fibers/Network/Racks/Power (A. Gianoli)
Fibers document separated from the rest of the computing resources Documents finalized (end of August) Power requirements: 100 kW total Racks Racks on Jura side: 800 mm depth (standard CERN racks) Racks on Saleve side: 1000 mm depth Dimensions of racks’ base plate is needed (for the supports) Power Detailed estimate of power: 68 kW95 kW (adding more computing nodes: 35 racks) Official request is 100 kW
3
L1/L2 farm design (J. Kunze)
4
Needs a powerful 10 Gb switch…
Issue of configuration/maintenance/integration with CERN network infrastructure
5
Back to the past: farm/network design evolution
Original scheme by M. Sozzi (until 2010)
6
Technical Design scheme (december 2010)
Large concentrating switch “downstairs” Large switch/router for L1 and L2 “upstairs” Separated switch and 10 Gb lines from downstairs for LKr (CREAM)
7
Latest design (april 2011) No large switch “downstairs”, small concentrating (110 Gb) switches 2 switches “upstairs”, one for detector/L1 and one for L1+CREAM/L2
8
Tests of data transmission protocols (J. Kunze)
9
Tests of data transmission protocols (J. Kunze)
Time to setup a joint effort in TDAQ + Computing working groups in order to build a common data movement software
10
Define requirements for 2012 run
11