Presentation is loading. Please wait.

Presentation is loading. Please wait.

GISC Beijing Status Report Doc25

Similar presentations


Presentation on theme: "GISC Beijing Status Report Doc25"— Presentation transcript:

1 GISC Beijing Status Report Doc25
Zhu Ting Feb. 2014

2 WIS centers in the responsible area of GISC Beijing
5 internal Data Collection or Product Centers - RTH Beijing - RSMC-Geographical (NMC) - RSMC-Activity-ATM (NMC) - RCC (Beijing NCC, - RA II) - NSMC 6 external National Centers or DCPC in responsible area - WWIS ( HongKong, China ) - Mongolia - Nepal - Pakistan - HongKong, China - Macao, China

3 GISC Beijing’s services
GISC Beijing has been operating traditional GTS and services of WIS Part-B. Part-A : Global Telecommunication System (GTS) Part-B : DAR service Metadata Management service WIMMS GISC Data Cache service Data Subscription service ( via GTS/Internet/CMACast satellite broadcast)

4 Status of subscription services (Part B)
Country Numbers Way Volume Australia 1 CMACast 20 GB/day Bangladesh 2 40 GB/day DPRK > 20 GB/day Indonesia Iran Kazakstan Kyrgyzstan Laos Malaysia Maldives Mongolia Myanmar Nepal Pakistan Country Numbers Way Volume Philippines 1 CMACast 20 GB/day Sri Lanka Thailand 2 40 GB/day Uzbekistan Viet Nam Hong Kong, China Macau,China Russia Internet (push) 7 MB/day Nepal (Pull ) 20 MB/day Mongolia 200 MB/day In Dec 2014, Routine dissemination for GISC Beijing’s subscription users

5 Networks In Jan 2014, GISC Beijing achieved the migration to RMDCN-NG.
For WIS core network In Jan 2014, GISC Beijing achieved the migration to RMDCN-NG. For AMDCN GISC Beijing will establish any-to-any MPLS VPN Circuit between AMDCN members. The investigation of technology schema has been finished.

6 Metadata Catalogue GISC Beijing has published WIS-GISC-BEIJING metadata catalogue, including records. GISC Beijing has updated discovery metadata for the responsible areas of GISC Beijing, but also based on WMO Core Profile 1.2.

7 Capacity building GISC Beijing provided on-site training to NMHMs, including the guidance for WIS implementation and application of subscription data on weather forecast. 2-5 DEC 2013, Mongolia Institute of Meteorology and Hydrology 9-13 DEC 2013, Nepal Department of Hydrology and Meteorology

8 Plans Develop WIS/GISC software to enhance our service quality and performance monitoring ability. Implement AMDCN Continue to prompt the capacity building of for neighboring countries.

9 Summary GISC Beijing has 5 internal operational Data Collection or Product Centers and 6 external National Centers or DCPC in responsible area. GISC Beijing has been operating traditional GTS and services of WIS Part-B. Ms Zhu reported the current statues of routine dissemination for GISC Beijing’s subscription users. Dissemination via CMACast takes the major work for subscription service. GISC Beijing achieved the migration to RMDCN-NG in Jan 2014. GISC Beijing provided on-site training to NC Mongolia and NC Nepal in Dec 2013. GISC Beijing plans to establish and implement any-to-any MPLS VPN Circuit between AMDCN members and develop WIS/GISC software to enhance our service quality and performance monitoring ability.


Download ppt "GISC Beijing Status Report Doc25"

Similar presentations


Ads by Google