1 The White Rose CCS Project
Richard Simon-Lewis, Head of Finance, Capture Power Ltd Delivering Economic Growth Through Advanced Infrastructure & Regeneration Birmingham, 28th April, 2015

2 Disclaimer © Capture Power Ltd All rights reserved.  Information contained in this document is indicative only.  No representation or warranty is given or should be relied on that it is complete or correct or fit for any particular purpose.  It is provided without liability and is subject to change without notice. This document contains confidential and commercially sensitive information.  Reproduction, use or disclosure to third parties, without express prior written authority is strictly prohibited. 

3 Topics Project Overview & Update UK CCS Vision & Roadmap

4 Architectural Options
‘Carbon Capture and Storage (CCS) has the potential to be one of the most cost effective technologies for decarbonisation of the UK’s power and industrial sectors, as well as those of economies worldwide’ CCS Roadmap Department of Energy and Climate Change Vision: White Rose CCS The Future of Clean Power Artist impression – courtesy of Arup Associates

5 Carbon Capture Storage (CCS) Snapshot
CCS = collection of CO2 emissions from plants, transportation via pipeline and permanent storage underground Capture of emissions from power and industrial facilities Main technologies for power CCS: pre-combustion, post combustion and oxy-fuel Storage techniques used for several decades for enhanced oil recovery (EOR) 23 million t/d of CO2 are currently being captured and stored around the world O C O

6 State of the Nation – CCS Deployment
22 large-scale CCS projects in operation or construction globally. Capacity to capture up to 40 mill. tpa of CO2 eq. 8 million cars off the road. 14 large-scale CCS projects in advanced planning stages 9 in the power sector, many of which are anticipated to take a FID in 2014/15. 1st large-scale CCS project in the power sector went live at Boundary Dam in Canada on 2nd October, 2014 Abu Dhabi CCS Project in the UAE (expected to come online in 2016) will be the world’s first large-scale CCS project in the iron and steel sector The next two large-scale CCS projects in the power sector are planned to come online in the US: Southern Company’s Kemper County Energy Facility in Mississippi (2016), and the Petra Nova Carbon Capture Project in Texas (2016) The US, Canada and China leading the world in the development and deployment of CCS projects Recent US-China emissions agreement likely a catalyst for accelerated CCS deployment. The UK is at the vanguard of CCS commercialisation in Europe (source: GCCSI)

7 CCS Drivers Intergovernmental Panel on Climate Change 5th Assessment Report (2013): “It is extremely likely [>95% certainty] that human influence has been the dominant cause of the observed [climate] warming since the mid-20th century”1 IPCC recommends reduction of global CO2 emissions by 50 – 85% by 2050 IEA recommends CCS contributes to 14% of cumulative CO2 emissions reduction to 2050 UK 2008 Climate Change Act – legally binding CO2 targets (80% cut in CO2 emission level by ) ETI indicate cost of reducing CO2 emission level without CCS in UK would equate to 1% GDP (£ £40Bn/yr) IEA projects that the cost of meeting a 50% reduction in CO2 emissions by 2050 would increase by 40% without CCS3 The main piece of regulation for CCS across Europe is the EU CCS Directive on Geological Storage of Carbon Dioxide (Directive 2009/31/EC), which came into force on 25 June 2009. IPCC 5th Assessment Report: Summary for Policymakers IEA Technology Roadmap CCS 2013

8 White Rose CCS - Project Snapshot
A full-chain integrated CCS project incorporating a new ultrasupercritical Oxy Power Plant, up to 448 MWe (gross) Located Drax, North Yorkshire providing >300 MWe clean power, equivalent to the needs of 630,000 homes 100% of flue-gas treated, 90% CO2 capture rate → 2 MTPA Biomass co-firing leading to zero - or negative - CO2 emissions CO2 transported c.a. 100 miles by pipeline to off-shore storage CO2 to be permanently stored in a deep saline formation Images from DECC publication

9 Delivery Plan OXY-POWER PLANT (OPP) CO2 TRANSPORT & STORAGE
Full-Chain Integration Carbon Ltd Partner roles, bringing depth of know-how and resources Delivery of OPP Integration of OPP O&M of OPP Trading Services Site and Site Services Fuel Supply Electrical Connection Delivery of ASU O&M of ASU Delivery of Transport & Storage network O&M of Transport & Storage network

10 Full-Chain CCS Project
GOOLE YORK HULL SELBY MARKET WEIGHTON DRIFFIELD BRIDLINGTON Oxy-Power Plant CO2 Pipeline CO2 Store: 5/42 Offshore Platform Additional Points: CCS = collection of CO2 emissions from plants, transportation via pipeline and permanent storage underground Capture of power or industrial emissions Main technologies for power CCS: pre-combustion, post combustion and oxy-fuel Used for several decades for enhanced oil recovery (EOR) 13 CCS plants globally in operation in 2014 (GCCSI) Not to scale

11 UK CCS Build Out Potential
UK has tremendous storage potential in the Northern, Central and Southern North Sea as well as the East Irish Sea According to ETI, the country has potential storage of 78 G tonnes, well in excess of required storage of 3 G tonnes for the UK industry by 2050 Transport networks to be planned for current and future CCS Maps source: 1 Energy Technologies Institute Insights Report, carbon capture and storage potential for CCS in the UK 2 SCCS Unlocking North Sea CO₂ Storage for Europe, Practical actions for the next five years SCCS Recommendations and Conference Report 2013

12 Project Status Preferred Bidder in the UK’s £1Billion CCS Commercialisation Programme FEED Contract awarded - signed by the UK Government on 20th December 2013 FEED underway: detailed engineering, risk reduction and planning programme leading to financial close, FID and construction commencement. Planning Process on track: Power Plant Development Consent Order (DCO) planning application accepted by UK Planning Inspectorate in December 2014; DCO application for CCS pipeline by National Grid accepted July 2014 Continuing work with the UK Government (DECC) towards Project Contract and Contract for Difference (CfD) FEED Actvities: Full-chain integrated technical definition Consenting and permitting Costing Execution plan EPC, trading and operation contracts CO2 transport & storage services agreement Project Contract & CfD Financing Knowledge transfer OPP DCO: Currently in pre-examination phase, 3 months anticipated to be complete April, 6 month examination phase followed by 3 months for preparing recommendation to the Secretary of State, which will take us to about the end of this year. The Secretary of State then has 3 months to make decision FEED Phase ~ 2 years Construction Phase ~ 4 years Operating Phase 15 – 20 years

13 Topics Project Overview & Update UK CCS Vision & Roadmap

14 CCS: Strategic importance
Security of supply The UK needs a diverse energy mix (incl. coal) and flexible generation to support intermittent RE and baseload nuclear Jobs and growth Appx 3,300 jobs at WR at peak construction averaging 1,000 jobs pa. Key role in decarbonising Energy Intensive Industries Climate change Fossil fuels still power over 80% world energy & expected to continue so CCS has a key role to play Path to COP21 / 2015 agreement Affordability Expected to be cost competitive in 2020s Without CCS climate targets £30-40bn more expensive per year Source slide: DECC

15 CCS: Strategic importance
Source slide: IEA

16 Path to Full Commercialisation
A cost-competitive CCS industry £1bn Commercialisation Programme (Phase 1) Transition Phase (Phase 2) Full Commercialisation (Phase 3) By 2030 Up to 13 GW of CCS power Levelised cost of electricity <£100/MWh By 2050 CCS could provide up to 20% of the UK’s energy Saving £30 bn White Rose CCS Project Peterhead CCS Project Source slide: DECC Source slide: DECC

17 CCS: Next Steps in Policy Scoping
Part Chain Capture CCU (Carbon Capture & Utilisation) Clustering BECCS (Bio-energy with CCS) Financial Incentives & Electricity Market Reform Industrial CCS Raising Finance Part Chain Storage EOR (Enhanced Oil Recovery) Source slide: DECC

18 CCS: Strategic importance
£1bn Commercialisation Programme (Phase 1) Industry Investment Transition Phase (Phase 2) Full Commercialisation (Phase 3) Government Source slide: DECC

19 Costs of Delivering CCS
CCS “has the potential to be cost competitive with other forms of low carbon power generation by 2020s” CCS Cost Reduction Task Force 1 UK CCS Cost Reduction Taskforce - Final Report-May 2013

20 CCS in Future Power Market
CCS is part of a diverse future energy portfolio 1. Gone Green, UK Future Energy Scenarios, National Grid, July 2013 2. DECC EMR Delivery Plan Dec 2013,

21 Coal and gas provide the flexible power needed for a balanced system
GB Power Demand - Nov 2013 Installed Wind Capacity 6 GW, actual generation between 0 and 4 GW Coal and gas provide the flexible power needed for a balanced system data from

22 Future GB Power Demand - Nov 2030
Installed Wind Capacity 35 GW forecast1, wind blows as in 2013 13 GW CCS 2 Flexible CCS will contribute to meeting variable demand from 2020, complementing intermittent renewables and base load nuclear UK Future Energy Scenarios (slow progression) , National Grid, July 2013 DECC EMR Delivery Plan Dec 2013, Chapter 6 Scenario Higher deployment rates of CCS

23 White Rose CCS – the ‘Flag Carrier’ for oxy fuel in Europe
White Rose will show that abated fossil-fuel power stations will be able to generate flexible, reliable and affordable power as mid-merit plants, providing security of supply and grid stability complementing base load nuclear generation and intermittent renewables White Rose CCS – the ‘Flag Carrier’ for oxy fuel in Europe Artist impression – courtesy of Arup Associates