ALICE T2 / FAIR Scope of the Meeting:
Summarize where we are, what we know, what we believe, ... What is the timeline? What is needed when? Establish a clear procedure to come to a decision within 2-3 weeks, how to spent approx. 240k€. Unfortunately we have today only 2 hours.
2
GSI ALICE T2/T3 2008/ k€ FAIR Invest 2010 ff: 300k€ per year Time CPU/ kSI2k 2007 2008 2009 2010 pledged T2 260 660 860 1100 planned T2/T3 400 1000 1300 1700 BMBF T2 project 2500 2860 Disk/TB 2007 2008 2009 2010 pledged T2 80 200 260 340 planned T2/T3 120 300 390 510 BMBF T2 project 800
3
CPU/ kSI2k 2007 2008 2009 2010 pledged T2 260 660 860 1100 planned T2/T3 400 1000 1300 1700 BMBF T2 project 2500 2860 end 2006 15 2*2core 2.67GHz Xeon 4*750GB disk D-Grid mid 2007 24 2*4core 2.67GHz Xeon 4*500GB disk GSI end 2007 54 2*4core 2.67GHz Xeon 4*500GB disk D-Grid mid 2008 112 2*4core 2.67GHz Xeon only system disk BMBF/ALICE T2 = 190 boxes ~ 1500 cores
4
Disk/TB 2007 2008 2009 2010 pledged T2 80 200 260 340 planned T2/T3 120 300 390 510 BMBF T2 project 800 mid 2007 20 * 6TB netto 120 TB GSI end 2007 35 * 6TB netto 210 TB D-Grid beg 2009 call f. tender 500 TB netto BMBF/ALICE T2 ~ 800 TB
5
w We want to provide a mixture of
a Tier 2 integrated in the AliEn Grid a Tier 3 including a PROOF farm integrated in the standard GSI batch farm (GSI, FAIR) We want to be able to readjust the relative size of the different parts on request. What we need to decide today? w Can we decide today? Do we need additional information? How much time do we have? Shall we go for local disks or not? Do we want to split the money? Is there synergy with FAIR? Should we buy s.th. useful for FAIR now and hope to get s.th. back later?... 990 k€ from BMBF for 2008/9 -300k€ BG 2 infrastructure -200k€ Blades (112 * 8 cores) - 40k€ Racks -10k€ Network equipment 240k€ rest for CPUs with or without local disk