NSTec - Incorporating Operating Experiences into Work Processes
Presented by: Kelly Pavalko November 3, 2016
2
How Does NSTec Integrate OPEX into Work Processes?
Project Management Assessments Issues Mgmt/caWeb Vulnerability Analysis Procurement Process Our LL/Best Practices OPEXShare Front Page Articles InSite SharePoint Site DAC Calls Pre-Job Briefs Work Planning OPEXShare is the most important tool that helps us locate operating experience to incorporate OPEX into NSTec work processes.
3
Integrating OPEX into Processes Using OPEXShare
History NSTec started using OPEXShare 11/2014 At that time it contained 4,000 articles; currently, it holds over 8,000 articles OPEXShare identifies and shares via OPEX at NSTec Subscriptions Reports
4
Integrating OPEX into Processes
Articles viewed
5
Encouraging the Workforce to Use OPEX through Communications
6
Encouraging the Workforce to Use OPEX through Communications - InSite SharePoint Site
7
Encouraging the Workforce to use OPEX through Communications - Daily Awareness Call
Sharing with employees can cascade down through the troops.
8
Integrating OPEX in Work Planning/Pre-Job Briefs
_ work planners are graded on OPEX they place in a work package points are deducted if it is not relevant.
9
Integrating OPEX in Project Management
Planning Phase Review past OPEX and Projects Goal is to identify past successes to repeated and past challenges to avoid Incorporation of OPEX in the planning process is to enhance the chance of success Execution / Closeout Phases Identify and document OPEX Provides input to future project planning activities
10
Integrating OPEX in Assessments
OPEX is used to develop assessment lines of inquiry Identified OPEX that may have similar conditions at NSTec Laser Safety assessment used OPEX LL-2015-LLNL-22 from LLNL to identify the same inadvertent use of different safety glasses. In the management assessment report, an OFI was recommended to prevent a similar incident from occurring
11
Integrating OPEX with Issues Management
Why integrate LL and issues? The majority of shared Lessons Learned come from issues we have entered into the Issues Management System (caWeb) Reviewing OPEX articles may provide an issue to enter into caWeb to take preventive action When it is uncertain how widespread an issue might be, we use an LL to share information with others to help address the potential Extent of Condition
12
Integrating OPEX into Work Processes Vulnerability Analysis
Performing a Vulnerability Analysis on OPEX is an option at NSTec U.S. DOE Office of Environmental Management, WIPP Accident Investigation Report (AIR) distributed throughout the NVE U1a Complex performed a vulnerability analysis based on the WIPP AIR Citations of identified weakness were extracted from the accident investigation report Analyst compared NSTec’s Process and data to the identified weakness Risks or Program and Performance Vulnerabilities were identified Reference to existing issues or new issues were created to track mitigation strategies
13
Integrating Procurement with OPEX
OPEXShare has recall information on products. We can contact Procurement to perform a search on items at NSTec and take them out of service if NSTec has purchased any of them.
14
OPEX Health Hazards of Prolonged Sitting
Since the 2014 U.S. DOE article, 108 standing workstations have been installed at NSTec An article was published in One Voice (March/April 2016) to highlight standing during meetings
15
Sharing Lessons Learned and Best Practices
16
OPEX Work Planning Heat Stress Pesticide Safety significant
17
NSTec Points of Contact