Presentation is loading. Please wait.

Presentation is loading. Please wait.

SHARE 2012 Planning Meeting 9/6/12

Similar presentations


Presentation on theme: "SHARE 2012 Planning Meeting 9/6/12"— Presentation transcript:

1 SHARE 2012 Planning Meeting 9/6/12
Expected Collection Date: 1 day between September 17-25th Sensor Update: No NRL SAR, chance of terrasar-x PI Target Update: Communications: chk & GO/NO GO Check message at Twitter 9AH_DIRS Timeline: Spectral Measurements Flag System: Team assignments: Food / Hardware Runner _______________ Radiosonde Assistant: AnneMarie and __________ ASD #1 Kelly and ________ ASD #2 RCR AnneMarie and _________ SpectraVista: John K and students Jamie/Emmett Shadow Target Deployment and __________ Erin Ontiveros & 10 T-shirt models _______ Ground Based LIDAR: Kerry and ________ Shea LIDAR targets _________ Test Target Deployment week of Sept when John K returns Thurs/Friday Next week early pack Trailer Contact: Nina Raqueno cell Can you help? Respond to Doodle Poll

2 SHARE 2012 Planning Meeting 9/6/12
Expected Collection Date: 1 day between September 17-25th Timeline: Night Before Weather Decision and Stand-by 6:00AM Final Weather Decision and Call in 7:00AM Meet at RIT carpool 7:30 Arrive at AVON Site 8:00-10:00 Deploy Targets 10:00 Radiosonde #1 Launch 10-11:00 Start Spectral Measurements 10:45 All Clear or in Place 11:00 Avon Overflights begin 12:00PM All Aircraft Clear Avon Start Conesus, Hemlock, Quarry Resume ASD Measurements & Move Targets to PM 12:30 Radiosonde #2 (plan A) 1:00-2:00 Aircraft Return to Avon Site 2:30 Radiosonde #2 (plan B) 3:00 5th Aircraft Polarmetric

3 Target ASD / GPS Naming System
SHARE 2012 Target ASD / GPS Naming System Expected Collection Date: 1 day between September 17-25th Contact: Nina Raqueno cell Request ASD Measurements here:

4 A place for PI to describe measurement SUBJECT DESCRIPTION
Measurement Details Ref/Rad PI Name Initial Spectra/GPS Filename: PAGRY1_F GPS/ Camera Spectra

5 Mode: ReFlectance (F)or RAdiance (A) 3 Letter Code for Material
Volleyball Sand Reflectance Measurement Anytime OK Does not move Kelly Canham C CASND1_F Mode: ReFlectance (F)or RAdiance (A) GPS/ Camera PI last name initial 3 Letter Code for Material Measurement Number 1-9 __ Space Reserved for Measurement Retakes/Mistakes/Clouds starting with b,c,d,e,f.... Spectra AM or PM location

6 Mode: ReFlectance (F)or RAdiance (A) 3 Letter Code for Material
New Target of Opportunity found in the field during afternoon flight Take 4 measurements in Radiance mode Kelly Canham C CPZZZ1_A Mode: ReFlectance (F)or RAdiance (A) GPS/ Camera PI last name initial 3 Letter Code for Material Measurement Number 1-9 __ Space Reserved for Measurement Retakes/Mistakes/Clouds starting with b,c,d,e,f.... Spectra AM or PM location


Download ppt "SHARE 2012 Planning Meeting 9/6/12"

Similar presentations


Ads by Google