1 Inventory for the non-radioactive waste
HSE/SEE-EN Overview of the CERN-wide inventory and legal background Waste issues in the Launch Safety Agreement (LSA) & HSE proposal LIU-PT meeting 30/06/2016 EDMS #

2 Overview of the CERN-wide inventory
LIU-PT meeting 30/06/2016 EDMS #

3 Overview of the CERN-wide inventory
LIU-PT meeting 30/06/2016 EDMS #

4 Overview of the CERN-wide inventory
LIU-PT meeting 30/06/2016 EDMS #

5 Overview of the CERN-wide inventory
LIU-PT meeting 30/06/2016 EDMS #

6 Legal background European Waste Directive
French Code de l’Environnement Swiss Environmental law LIU-PT meeting 30/06/2016 EDMS #

7 Legal background Specifically for worksites with formal “demande de permis de construire”: French “Schéma d’organisation des déchets de chantier” (SOSED) Swiss “Déclaration de gestion des déchets de chantier” (following SIA 430) LIU-PT meeting 30/06/2016 EDMS #

8 Waste issues in the Launch Safety Agreement (LSA)
→ Overall requirements For waste produced by contractors activities defined within EDMS – Working on the CERN Site (no traceability – to be confirmed) “ Il est de la responsabilité du contractant d’évacuer et d’éliminer les déchets ou produits chimiques résiduels qu’il aura introduits ou produits sur le site du CERN ” Other case : CERN waste eliminated otherwise than through CERN centralized waste collection services - SMB+ITP (e.g oil collected by ABB – no traceability – no accounting – to be confirmed) LIU-PT meeting 30/06/2016 EDMS #

9 Waste issues in the Launch Safety Agreement (LSA)
→ Worksite LIU-PT meeting 30/06/2016 EDMS #

10 Waste issues in the Launch Safety Agreement (LSA)
→ Safety File – Project phase LIU-PT meeting 30/06/2016 EDMS #

11 Waste issues in the Launch Safety Agreement (LSA)
→ Safety File – Worksite – if formal building permit required LIU-PT meeting 30/06/2016 EDMS #

12 HSE proposal for the non-radioactive waste inventory
By mid September – introduction of a template for the non-radioactive waste inventory, considering the waste categories that are already declared through the annual waste inventory – shall be documented in the Safety File of the project; Shall be defined at the project phase, focussing on operation, shall inform about the annual waste production; For worksites that would required a formal construction permit, CH/F documents established in this framework shall be included in the Safety File of the project. LIU-PT meeting 30/06/2016 EDMS #

13 Conclusion Good knowledge of the annual amounts of non-radioactive waste collected. However, associated producers not traced/registered; HSE is still on the way to understand how waste traceability is performed within the Organization – identified already room for improvements; Assessing the amounts of waste produced by an activity is part of a environmentally responsible behaviour, enables to identify specific sorting needs, to anticipate elimination/valorisation pathways and at the end, contributes to limit the impact on the environment. The new Direction is committed to act: CERN Bulletin – 29 February 2016 – Fabiola Gianotti – “One of the main objectives of the HSE (Occupational Health and Safety and Environmental Protection) unit in the coming months is to enhance the measures to minimise CERN’s impact on the environment. I believe CERN should become a role model for an environmentally-aware scientific research laboratory.” LIU-PT meeting 30/06/2016 EDMS #