Baseline CPT Test Baseline CPT Testing June 2017 Mission Simulation 2
Horizontal Sunday Monday Tuesday Wednesday Thursday Friday Saturday Harness Blankets Louvers Fault manage Mission Simulation 2 1 2 3 Mission Sim 2 4 5 6 7 8 9 Autonomy FM Testing 10 Fault Management Fault Management EPS Autonomy S/C Clean then cable up and power up G&C Avionics 11 Pump Electronics 12 13 14 15 V3 subspacer install 16 17 Cooling system Harn, inc SA Boom#1 Integrate SA Boom2 FSW 4.1 Integrate S/A Boom 2 Accumulator Integration Accumulator Integration Fault Management Fault Management Move S/A #1 boom to 45 degrees Fault Management S/A Boom/sub spacer/imu Align. Autonomy RF Troubleshooting Fault Management/G&C CPT Dry Run Autonomy G&C 18 19 HGA Integration 20 21 Harness PDU, REM HGA Integration EPS,RPM Baseline CPT Test 22 RF 23 G&C HW, SACS, Prop 24 Autonomy G&C Fault Management V1,V3 Integration and deploy V1,V3 Stow and Stimulate Tent. HGA Alignment V1,V3 Installation Autonomy WISPR, FIELDS, ISOIS Contingency 25 26 27 28 29 30 SWEAP, Multi-Instr. CPT SIM #1,2 CPT SIM #3,4 Contingency Baseline CPT Testing
2
EMI / EMC part 1 July 2017 MAG SWING TEST thru 7/5 EMI/EMC part 2
Horizontal Sunday Monday Tuesday Wednesday Thursday Friday Saturday Fault Manage MAG SWING TEST 1 2 3 4 5 Mag Boom Install Deploy and Alignment 6 7 8 MAG SWING TEST thru 7/5 Install Mags and V5 onto Mag Boom G&C Testing Fault Management Fault Management EMI / EMC part 1 9 Mag Boom continued 10 11 Blankets 12 Blankets 13 Blankets 14 15 Autonomy Fault Management Tilt over and bond LGA3 bracket 16 17 Blankets 18 19 Move to Low Dolly and config CS Then roll back in. 20 EMI/EMC part 2 Cooling System 21 22 Blankets Roll out for IMU phasing and WISPR 1G sag Meas. EMI/EMC part 1 23 24 25 26 27 28 29 S/C Clean Autonomy FM Testing Separation Sequence Test HI/LO Voltage Test Autonomy Autonomy Fault Management Fault Management Fault Management Timekeeping G&C G&C 30 31 Fault Management Autonomy Timekeeping
3
RESERVE RESERVE RESERVE August 2017 Horizontal Sunday Monday Tuesday
Wednesday Thursday Friday Saturday SPP Summer Celebration Details coming Soon 1 2 Autonomy testing FM Testing 3 Autonomy FM Testing 4 5 Fault Management Fault Management Autonomy Autonomy G&C 6 7 RESERVE 8 9 RESERVE 10 11 12 G&C ECU Phasing for score HGA Fault Management Timekeeping 13 RESERVE 14 15 16 17 18 19 Move to Bldg 30/ Pack and move GSE Move to Bldg 30/ Pack and move GSE 20 21 22 23 24 25 26 Install Flight TPS GSE Checkout Install Flight TPS GSE Checkout Alignments GSE Checkout Alignments GSE checkout Remove TPS GSE Checkout 27 Remove TPS and reconfigure Cable up and run Aliveness 28 Move to MIS for drain and dry of cooling system 29 Blankets 30 Blankets 31 Prop leak and functional Water Load of Prop Tank