1 Project hammer d00219 Sub Cluster CA - SSO Celcom CA Project
Project hammer d00219 Sub Cluster CA - SSO © Ericsson AB 2016

2 PROJECT BAU MODERNIZATION
CONTENTS SINR Analysis CSFB Call Setup Time Analysis

3 D00219 CA-report – DT KPI overview – 4G
Celcom CA Project D00219 CA-report – DT KPI overview – 4G © Ericsson AB 2016

4 PROJECT BAU MODERNIZATION
SINR Analysis

5 D00219_DT KPI—4G DT KPI lte sinr
Celcom CA Project D00219_DT KPI—4G DT KPI lte sinr Summary: 3 areas are identified with bad SINR issue, circled as the left. Area1 Area2 Area3 PA Comments 1 Bad SINR due to no domain cell 2 3 © Ericsson AB 2016

6 D00219_DT KPI—4G DT KPI lte sinr 1/3
Celcom CA Project D00219_DT KPI—4G DT KPI lte sinr 1/3 Area 1: Analysis: Bad SINR at this area is due to no domain cell. Area is 1100m away from nearest site EL20130, while the signal is blocked by dense trees. Due to the demands are not high at this area, throughput is good in this area indicating that users’ experience are not influenced. LTE SINR Footprint for EL20130_8_2 Area1 Area1 signal is blocked by trees Site view from EL20130_8_2 1.1KM DL Throughput © Ericsson AB 2016

7 D00219_DT KPI—4G DT KPI lte sinr 2/3
Celcom CA Project D00219_DT KPI—4G DT KPI lte sinr 2/3 Area2 Area 2: Analysis: Bad SINR at this area is due to no domain cell. Area is 1100m away from nearest site EL20158, While the signal is blocked by trees. DT result is better than the simulation result. LTE SINR Footprint for EL20158_8_1 Area2 signal is blocked by trees Sector 40 degrees of EL20158 1.1KM DL Throughput © Ericsson AB 2016

8 D00219_DT KPI—4G DT KPI lte sinr 3/3
Celcom CA Project D00219_DT KPI—4G DT KPI lte sinr 3/3 Area 3: Analysis: Bad SINR at this area is due to no domain cell. Area is 1700m away from nearest site EL20184, While the signal is blocked by trees. DT result is better than the simulation result. Area3 LTE SINR Footprint for EL20184_8_2 EL20184 1.7KM Site view from EL20184_8_2 signal is blocked by trees DL Throughput © Ericsson AB 2016

9 CSFB CALL SETUP TIME Analysis
PROJECT BAU MODERNIZATION CSFB CALL SETUP TIME Analysis

10 D00219 CA SSO dt kpi—4G DT KPI A.19.4.10.19 CSFB call setup time
Celcom CA Project D00219 CA SSO dt kpi—4G DT KPI A CSFB call setup time Analysis: There are 126 times CSFB, and 89% of samples CSFB Call Setup time is less than 6.5s. 2 times of CSFB Call Setup time are more than 9s 3. As Below CDF plot shows, the CSFB Call Setup time of most of samples are less than 9s, thus the subscriber experience won't be influenced. © Ericsson AB 2016

11 Hammer Project Celcom Exec Steering
D00219 CA SSO dt kpi—4G DT KPI A CSFB call setup time1/2 Signal Point Time Sample Latency(s) EXTENDED_SERVICE_REQUEST 1:50:32.786 EXTENDED_SERVICE_REQUEST -> RRCConnectionRelease 0.242 RRCConnectionRelease 1:50:33.028 RRCConnectionRelease -> CM_SERVICE_REQUEST 1.438 CM_SERVICE_REQUEST 1:50:34.466 CM_SERVICE_REQUEST -> SETUP 6.228 SETUP 1:50:40.694 SETUP -> ALERTING 3.329 ALERTING 1:50:44.023 Total 11.237 Analysis: 1. High latency from CM_SERVICE_REQUEST to SETUP as UE was receiving SMS (terminatinghighPrioritySignaling) during these 4 signalings. Propose to disable the SMS service for the test SIM Card. 3 2 4 1 RRCConnectionRelease 6.707 s RRC_CONNECTION_SETUP_COMPLETE Proceeding 3.04s CN Responding © Ericsson AB 2016

12 Hammer Project Celcom Exec Steering
D00219 CA SSO dt kpi—4G DT KPI A CSFB call setup time2/2 Analysis: 1. High latency from CM_SERVICE_REQUEST to SETUP as UE was receiving SMS (terminatinghighPrioritySignaling) during these 4 signalings. Propose to disable the SMS service for the test SIM Card. 3 2 4 1 RRCConnectionRelease 7.18 s RRC_CONNECTION_SETUP_COMPLETE Proceeding 3.033s CN Responding © Ericsson AB 2016