Download presentation
Presentation is loading. Please wait.
1
IEEE 802.11TGai Closing Report
April 2009 doc.: IEEE /xxxxr0 March 2011 IEEE TGai Closing Report Date: Authors: Name Company Address Phone Hiroshi MANO ROOT Inc. 8F TOC2 Bldg Nishi-Gotanda, Shinagawa-ku, Tokyo JAPAN Marc Emmelmann Fraunhofer FOKUS Kaiserin-Augusta-Alle Berlin Germany Hiroshi Mano (Root Inc.) Rich Kennedy, Research In Motion
2
April 2009 doc.: IEEE /xxxxr0 March 2011 Abstract This presentation is the closing report for the Singapore meeting of the IEEE TGai. Hiroshi Mano (Root Inc.) Rich Kennedy, Research In Motion
3
Agenda for this week March 2011, Singapore
April 2009 doc.: IEEE /xxxxr0 February Agenda for this week March 2011, Singapore Official agenda of WG Monday PM1 Tuesday PM1, EVE Wednesday AM1,AM2 Thursday PM1 Goals for the Meeting: Review and Approve the Los Angels and Teleconference meeting minutes Presentation of submissions Draft use case scenario documentation TIME line of task group Plan for May & Teleconference Hiroshi Mano , Root Inc Rich Kennedy, Research In Motion
4
Accomplishments TGai 1/3
March 2011 Accomplishments TGai 1/3 Submission of Presentation 0357/00 A focused path forwad Tgai D1.0 0334/00 TGai scope discussion (A. Yamada/ NTT Docomo) 0326/00 Use-Case-Reference-List-doc discussion (Tom Siep / CSR) 0148/06 Use cases for TGai Lee Armstrong (US DoT) 0281/00 Proposed Dynamic Mobility Use Cases for TGai (Carl Kain / Nobils) 0333/00 TGai possible use cases (A. Yamada/ NTT Docomo) 0337/00 discussion-points-on-portal-locations (Dwight Smith ,Motorola Mobility) 0356/01 Selection Procedure for TGai (Y. Nagai Mitsubishi Electric) Hiroshi Mano (Root Inc.)
5
Accomplishments TGai 2/3
March 2011 Accomplishments TGai 2/3 Submission of Presentation 0343/00 Pedestrian model (Hitoshi Morioka, Root Inc.) 0408/00 Use Case Characteristics discussion (Tom Siep / CSR) 0238/04 Use Case Documentation (Tom Siep /CSR) 0435/00 Definition of terminology from (Marc Emmelman /Fokus) 0408/01 Use Case Characteristics discussion (Tom Siep / CSR) 0441/00 Self growing use cases requiring fast link set up (Marc Emmelman Fokus) 0238/05 Use Case Documentation (Tom Siep /CSR) Hiroshi Mano (Root Inc.)
6
Accomplishments 3/3 TGai
March 2011 Accomplishments 3/3 TGai Reviewed and Approved the Los Angels and Teleconference meeting minutes Drafting Use Case Scenario documentation Approve the terms and definitions in 11-11/0408r2 as official TGai terminology. Approve the values of high/medium/low given for each definition as in the 11-11/0408r2. Approved Weekly Teleconference schedule Approved Plan for May Finish the use case scenario Finish the functional requirement Finish the technical requirement Hiroshi Mano (Root Inc.)
7
March 2011 Motion: Motion: Approve the terms and definitions in 11-11/0408r2 as official TGai terminology. Moved :Tom Siep (CSR) Second: Lee Armstrong (US DOT) Result Passed Tom Siep, CSR
8
March 2011 Motion: Motion: Approve the values of high/medium/low given for each definition as in the 11-11/0408r2. Moved :Tom Siep (CSR) Second: Lee Armstrong (US DOT) Result Passed Tom Siep, CSR
9
Teleconference Schedule
March 2011 Teleconference Schedule Motion: Approve the following schedule of weekly teleconferences. Tuesdays 08:00 EST (NY Time) continue until 29th Mar. Tuesdays 09:00 EST (NY Time) start from 5th Apr. Duration 1Hour Using WEB-EX that will be provided by Task Group Chair Moved: Marc Emmelmann ( Fokus ), Seconded: Dwight Smith (Motorola Mobility) Result: Motion passed Hiroshi Mano (Root Inc.)
10
Time line of TGai to draft 1.0
March 2011 Time line of TGai to draft 1.0 Use case scenario finished May 2011 Functional Requirement May 2011 Technical Requirement finished May 2011 Call for Proposal start May 2011 Proposal submission close Jul 2011 Evaluation and down selection proposal, Jul11 to Sep 11 Hiroshi Mano (Root Inc.)
11
Time line of TGai WG Letter Ballots Initial / Recirc Sep 11 / Jan 12
April 2009 doc.: IEEE /xxxxr0 March 2011 Time line of TGai WG Letter Ballots Initial / Recirc Sep 11 / Jan 12 Form Sponsor Ballot Pool / Reform Jul 12 MEC Done Jul 12 IEEE-SA Sponsor Ballots Initial / Recirc Sep 12 / Dec 12 Final WG Approval Jul 13 Final or Conditional 802 EC Approval Jul 13 RevCom & Standards Board Final or Continuous Process Approval Sep 13 ANSI Approved N/A Hiroshi Mano (Root Inc.) Rich Kennedy, Research In Motion
12
Documents Approved Minutes
March 2011 Documents Approved Minutes ai-tgai-meeting-minutes-for-the-ieee january-2011-interim.doc ai-january-march-teleconference-minutes.doc Hiroshi Mano (Root Inc.)
13
Thanks to all who participated!
March 2011 Thanks to all who participated! Hiroshi Mano (Root Inc.)
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.