Download presentation
Presentation is loading. Please wait.
1
GRINDING and PARTICLE SIZE REDUCTION
Keith Behnke Dept. of Grain Science and Industry Kansas State University Manhattan, Ks
2
WHY DO WE GRIND? IMPROVED ANIMAL PERFORMANCE INCREASED MIX UNIFORMITY
IMPROVED PELLETING
3
MEASURING PARTICLE SIZE
4
PARTICLE SIZE TEST (ASAE STANDARD - S319)
This method involves using a sieve stack to determine the geometric mean particle size (dgw) and the geometric standard deviation (sgw). Results can be obtained either graphically or through calculations.
5
ESTIMATING PARTICLE SIZE
6
A Quick Method for Estimating
PARTICLE SIZE Minus 14 Mesh (%) Particle Size (Microns) 90-95% 500 80-90% 600 70-80% 700 65-75% 800 60-70% 900 50-60% 1000 Source: Champion-Roskamp, Waterloo, IA.
7
METHODS OF GRINDING Impact Compression Shear Attrition
8
HAMMERMILLS
9
ADVANTAGES Ability to grind a wide variety of materials
Ease of maintenance, less maintenance cost Versatility Less complicated to operate Less initial cost
10
DISADVANTAGES Energy consumption Produces a greater Sgw
Noise and dust pollution Heat generation and moisture loss
11
ROLLER MILLS
12
ADVANTAGES- Rollermills
Electrical efficiency Particle size uniformity Less maintenance Less dust pollution
13
DISADVANTAGES Rollermills
Higher initial cost When maintenance is needed it is expensive Can not effectively grind fibrous materials Reduced throughput at small particle sizes
14
Roller Mills vs Hammermills
ENERGY COST COMPARISON Roller Mills vs Hammermills Grinder Type Particle Size (microns) Energy Cost ($/ton) Savings (%) Hammermill 399 1.56 Roller Mill 432 1.31 16 718 .65 709 .47 28 2,040 .35 1,813 .05 86
15
PRE-GRINDING Vs. POST-GRINDING SYSTEMS
17
PRE-GRINDING SYSTEM Advantages Disadvantage
Longer grinding time a t full motor load Gives a buffer for down time or maintenance on the grinder Disadvantage Requires more storage bins for both ground and raw ingredients
18
POST GRIND SYSTEM Advantages Disadvantages
Accommodates material changes Does not require as many storage bins Disadvantages Less energy efficient Directly affects the capacity of the facility
19
INNOVATIONS IN GRINDING
20
THE FUTURE! GRINDING OPERATIONS * Hammer Design and Metallurgy
* Air Assist System Design * Noise Control * Automation and Routing * Quick-Change Screens * Quick-Change Hammer Gangs
21
THE FUTURE! GRINDING OPERATIONS * Vertical Shaft Hammermills??
-European Designs now available -Air-Assist not recommended
22
THE FUTURE! GRINDING OPERATIONS * AUTOMATION???
-The One System That Clearly Should Be Automated!! -Start-up/Shut-Down, Routing and Ingredient Changes -Lights Out Operations??
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.