1
CRT / Test area @ KEK Fuji
Tomokatsu Hayakawa Nagoya University 12th B2GM 2012/7/23
2
TOP assembly room & TOP preparation/test area
12th B2GM 2012/7/23
3
(B4) Slide from Horii-sensei (2012/05/24, PID meeting)
ATLAS (TGC) Panel House @ KEK Fuji (B4) reused as “TOP assembly room” (Construction June 23rd) Tent side space for preparation & test area (Construction July 5th) Provision of infrastructure: Done (thanks to Adachi-sensei & Hayashi-san) Now ready to start our Fuji PID mornning meeting Slide from Horii-sensei (2012/05/24, PID meeting) 2018/7/6
4
TOP assembly room Buffer room Dark room Buffer room
Clean Buffer Room (Cleanliness Level: ISO7) Quartz temporary storage ATLAS Panel House which has 1 big FFU (Clean air dumpers not worked yet) Clean Dark Room (Cleanliness Level: ISO6) Quartz acceptance test & glue Installation into QBB “Clean Dark booth” that has 12 FFUs in the Panel House Dark room 12th B2GM 2012/7/23
5
TOP assembly room (Cleanliness Level)
Lab. visit Limit maintenance Limit Buffer room Dark room Clean Booth Setup Commissioning Quartz Measurement Buffer Room FFU & Clean Dark Booth work well. Performance: Class 100(Dark) / Class 1000 (Buffer) (1 worker) achieved easily. Quartz: Bring some dust Procedure to be improved (Worker training is also important. ) 12th B2GM 2012/7/23
6
Fuji Side Space (Preparation / Test area)
Cosmic-Ray Test (CRT), HV test, QBB, FrontEnd,… Any others? Space (is limited. Please share the tables/racks etc ) CRT stand: 400cmx490cmx500cm(H) CRT DAQ, HV test, …: 300cmx300cmx250cm(H) Electronics & PMT, …: 250cmx200cmx250cm(H) Mechanics: 240cmx490cmx500cm(H) 12th B2GM 2012/7/23
7
CRT preparation 12th B2GM 2012/7/23
8
Cosmic-Ray Test (CRT) Originally proposed by Gray-sensei
Start/Timing counter Modified Belle TOF counter 40mmX60mmX200mm Scinti. Bar viewed by 2 FM-PMTs 4layers (t resolution~40-50ps) Trigger Counter Nominal Bell e TOF counter Range Stack Beta selection & shower blocker Fe blocks: 1-1.5m (t) And/or Lead blocks Tracker SciFi tracker Transporter… Stand… Originally proposed by Gray-sensei
9
CRT preparation Counter Tracker Block Stand
5 Shortened TOF counters (20cm) tested in May Read out: CAMAC ADC + TDC Intrinsic time resolution: ps (w/o position correction) ΔTOF (4layers) ~ / sqrt(4) = 40-50ps (to be refined) Tracker Nagoya SciFi Tracker under Nagoya U. SciFi planes already prepared by Matsuoka-san Front-end Board mass(?) production ASAP Read out: CAMAC TDC (3377) Expected position resolution: mm Block Iron: 1m X 0.5m X 0.25m iron block x 6 Concrete: 1mX2mX0.5mx8 Stand …. 12th B2GM 2012/7/23
10
CRT preparation Schedule
Deadline (CRT) Deadline (LEPS) Jul Aug Sept Oct Nov Dec Counter Tracker HV Stand Blocks / parts etc. Test (t resolution etc.) Production Assembly (~80ch) Production CAEN HV module test CAEN Shipping for LEPS beam test Design & construction by ???? Final CRT stand Construction(?) Backup option LEPS beam test preparation LEPS beam test Nagoya TOP meeting 2012/7/18
11
CRT stand a proposal (backup option)
A well-designed CRT stand Quite important for CRT. I totally agree. No objections... Reviews and beam tests in the near future Assembly space and “test bench” in the tent to be the beginning of Sept…. Tight construction schedule Very tight to fix the design & to construct KEK Fuji B4 by the middle of August It seems that we don’t have enough materials / parts for CRT stand yet… A proposal / backup option Very temporary CRT setup (only for data taking this summer) only if well-designed CRT stand is not ready. Arrangement : ~1 week, Construction: ~1 week, Assembly: ~2 week ~1 month The setup to be disassembled ASAP when the well-designed stand is ready 12th B2GM 2012/7/23
12
Simplest CRT setup (2012 summer)
Only materials / parts KEK now Save-saving design (enough space for scaffolding & rolling tower) Fast & easy construction (~ 1 week) + operational test (~ 1week) Access Al frame ~1m Belle ACC / Gas Cherenkov(?) Access TOP (Al support frame) Nagoya Tracker Trigger/Timing Counters (20cm TOF x 4 layers) Rolling Tower (or scaffolding) 1.8m Iron 1m(t) Iron blocks 1m X 0.5m X 1m(t) (or Lead + Iron blocks) C-shape blocks (or Al support frame Access Access Belle TOFx1 Floor level 1.3m 3.3m 12th B2GM 2012/7/23
13
Summary TOP assembly room & preparation / test area are ready.
Enough cleanliness level in the Panel house easily achieved if users perform proper maintenance work regularly. Tent for TOP preparation / test constructed. Let’s (re)start QBB / electronics / Cosmic-ray KEK Fuji. CRT preparation on going Counters / Trackers for the CRT under KEK and Nagoya Some iron / concrete blocks also reserved in May Pb blocks not found yet (What size is the block?) CRT setup: A backup option proposed One of the simplest CRT setups (only for data taking this summer) Fast & easy construction is a key point due to the tight schedule. 12th B2GM 2012/7/23
14
backup 12th B2GM 2012/7/23
15
Shielding Blocks Blocks prepared for “Range stack”
1m X 0.5m X 0.25m iron block x 6 1mX0.5mX0.5m iron block x ??? (Adachi-san’s blocks) 1mX2mX0.5m concrete block x 8 Slide from 2012/5/10 PID meeting We don’t have many blocks. Which combination do you prefer? (option1) – thickest -- 1m X 0.5m X 1.5m (t) (option2) -- ??????? -- 2m X 0.5m X 1m(t) + 1m X 0.5m X 0.5m (t) (option3) – widest -- 3m X 0.5m X 0.5m (t) 12th B2GM 2012/7/23
16
Other Blocks C-shape concrete blocks x 7 1.2m or 1m
1.2mL type x 7 1.0mL type x 7 Stage (work bench) ? 1.2m or 1m Slide from 2012/5/10 PID meeting 1.5m 1.8m 0.56m (0.83m Thick) 12th B2GM 2012/7/23
17
β selection Range Stack (+ Shower blocker) 1m-1.5m (t) Iron blocks
Thickness is one of main constraints on CRT stand. Other heavy materials (Pb?)? Easy to get KEK? Other possibilities CO2 Gas Cherenkov Counter + thin iron block (shower blocker) Now under KEK… Accept(????) 12th B2GM 2012/7/23
18
Fuji B4 (5/10 10H00) Scaffolding (a candidate) 12th B2GM 2012/7/23
19
Floor layout (in the tent)
CRT area 4.75m Scaffolding Setup (C-shape blocks) Scaffolding Installation / Construction crane operation (by Futaba or Hitachi) KEK safety regulations to be checked. Scaffolding / Rolling Tower Important to access to the setup. 4m Rolling Tower (option) 12th B2GM 2012/7/23
20
Fuji Side Space (Preparation / Test area)
12th B2GM 2012/7/23