Download presentation
Presentation is loading. Please wait.
2
YETS 2017 / 2018 Leszek Borakiewicz IT-CS-DO
PSB/PS/TT2/Linac2-3 preparation meeting – October 12th 2017 IT/CS Mandate
3
IT/CS Mandate IT Campus Network Telephony
Technical Network – all Machine connected devices (and only) GPN Network PCs, Printers etc. Wi-Fi Network IP Telephony Telephony Analogue phones / fax (TO BE DISMANTLED DURING LS2 !!!) GSM Network (4G included) TETRA – Security Radio Network IT/CS Mandate
4
Meyrin Area taken into account
A shared IT infrastructure in all buildings within Any, even office installation request can be fulfilled only during Technical Stops !!! As for now, a small quantity of works are announced IT/CS Mandate
5
Meyrin Area taken into account
A shared IT infrastructure in all buildings within Any, even office installation request can be fulfilled only during Technical Stops !!! As for now, a small quantity of works was requested LS2 - Major TN Routers upgrade is foreseen – please, announce any works if not done yet IT/CS Mandate
6
YETS 2017 / 2018 Major UTP for Wi-Fi cabling works in all of B. 354
Wi-Fi extension in 355 Small UTP cabling works in B.150, 151, 170 & 179 Technical Network capacity upgrade in B.193 TN devices renumbering in PSB – follow-up of Campus Network changes done during last EYETS New GSM Leaky Feeder for PS: works will be done by EN/EL, some telephony outage to be foreseen IT/CS Mandate
7
Existing Infrastructure
IT Network information can be accessed using the GIS Portal. The data is updated once a day and available under IT/CS Mandate
8
Contact – in advance Contact for any questions about PSB/PS/TT2/Linac2-3 IT works: Leszek Borakiewicz < > For works coordination, any new request etc., please, put in a copy / watch list: Maryse Da Costa < > IT/CS Mandate
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.